Search found 51 matches

by aaronjameslange
Sat Oct 12, 2019 10:54 am
Forum: Infrastructure/Transport Development
Topic: [U/C] North-South Motorway
Replies: 4133
Views: 604791

[U/C] Re: North-South Motorway

R2P section. All the trees on the regency tafe and coopers brewery site have been removed, excavators are moving the mound of dirt from the coopers site. Site compound being built opposite polonia soccer club
by aaronjameslange
Sat Oct 05, 2019 9:14 am
Forum: Infrastructure/Transport Development
Topic: [U/C] North-South Motorway
Replies: 4133
Views: 604791

[U/C] Re: North-South Motorway

Handrails don’t look too bad. They will be replaced in coming weeks with the same large screens found on the other bridges. When driving on it at the moment I am taking in the view. Dont see why the bridge would need throw screens as it is not designed for pedestrian access. Yes you could lob an ap...
by aaronjameslange
Tue Sep 24, 2019 9:16 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] Northern Connector | 14km | $1b
Replies: 872
Views: 198752

[U/C] Re: Northern Connector | 14km | $1b

September 2019 newsletter now on website. Contains absolutley no new information. Completion date still marked as 'late 2019'
by aaronjameslange
Thu Sep 19, 2019 11:56 am
Forum: Infrastructure/Transport Development
Topic: [U/C] North-South Motorway
Replies: 4133
Views: 604791

[U/C] Re: North-South Motorway

2020 is only 3 months away. If its completed early 2022, thats only 2 1/4 years from now
by aaronjameslange
Tue Sep 10, 2019 11:50 am
Forum: Infrastructure/Transport Development
Topic: News & Discussion: Trams
Replies: 4402
Views: 605886

Re: News & Discussion: Trams

Ho Really, what's with all of your going against the grain of late? Time has been saved by the implementation of the O-Bahn tunnel, whether they needed to spend that much to make that happen is another story but there is no denying it has saved travel time for buses. Patrick_27 , since day one I've...
by aaronjameslange
Sat Aug 31, 2019 4:05 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] North-South Motorway
Replies: 4133
Views: 604791

[U/C] Re: [U/C] Re: North-South Motorway

Disinterring a third of Hindmarsh Cemetery to accommodate a shallower curve at the current level is not likely to be a popular solution My mother heard on the grapevine that for some time, the State Government has been quietly buying the plots in the cemetery as they become available. I thought tha...
by aaronjameslange
Fri Aug 30, 2019 9:23 am
Forum: Infrastructure/Transport Development
Topic: [U/C] North-South Motorway
Replies: 4133
Views: 604791

[U/C] Re: North-South Motorway

R2P update:
With redwood machinery and royce ave shops now demolished, it only leaves the solar shop on regency road, a hydro/airconditioning shop and the soccer ground to be demolished. SAPN works are already underway with relocating the HV lines to side streets.
by aaronjameslange
Tue Aug 06, 2019 10:33 am
Forum: Infrastructure/Transport Development
Topic: [U/C] Northern Connector | 14km | $1b
Replies: 872
Views: 198752

[U/C] Re: Northern Connector | 14km | $1b

Wouldn't they just be referring to each section as they are being built, regarding things like "northern interchange"...? Surely when the whole corridor is complete, they will have specific names for each significant part. The road signs are already up, but covered over, at Waterloo Corner intercha...
by aaronjameslange
Fri Jul 26, 2019 9:46 am
Forum: Infrastructure/Transport Development
Topic: [U/C] Northern Connector | 14km | $1b
Replies: 872
Views: 198752

[U/C] Re: Northern Connector | 14km | $1b

ChillyPhilly wrote:
Thu Jul 25, 2019 10:29 pm
Bridge spans are now in place for what will become the new eastbound carriageway of the Port River Expressway.
Also the northbound port wakefield road bridge spans at the northern interchange
by aaronjameslange
Tue Jul 23, 2019 9:07 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] North-South Motorway
Replies: 4133
Views: 604791

[U/C] Re: North-South Motorway

Noticed tonight the large gum trees at regency park tafe are coming down ready for r2p. And only a handful of businesses to be demolished. Pretty much all the residential buildings along the corridor have been levelled
by aaronjameslange
Tue Jul 02, 2019 10:37 am
Forum: Infrastructure/Transport Development
Topic: [U/C] Northern Connector | 14km | $1b
Replies: 872
Views: 198752

[U/C] Re: [U/C] Re: Northern Connector | 14km | $1b

Some night works this week, getting ready for closure of the temporary superway to salisbury highway off ramp and moving to the new flyover offramp. Would be nice if it was 2 lanes but me thinks only 1 Will it be the new flyover that opens on Monday morning after the last night of closures? I doubt...
by aaronjameslange
Mon Jul 01, 2019 8:07 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] Northern Connector | 14km | $1b
Replies: 872
Views: 198752

[U/C] Re: Northern Connector | 14km | $1b

Some night works this week, getting ready for closure of the temporary superway to salisbury highway off ramp and moving to the new flyover offramp. Would be nice if it was 2 lanes but me thinks only 1
by aaronjameslange
Mon Jul 01, 2019 8:07 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] Northern Connector | 14km | $1b
Replies: 872
Views: 198752

[U/C] Re: Northern Connector | 14km | $1b

Some night works this week, getting ready for closure of the temporary sulerway to salisbury highway off ramp and moving to the new flyover offramp. Would be nice if it was 2 lanes but me thinks only 1
by aaronjameslange
Thu Jun 27, 2019 1:33 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] North-South Motorway
Replies: 4133
Views: 604791

[U/C] Re: North-South Motorway

Lots of houses now cleared on the eastern side of the R2P section
by aaronjameslange
Wed Jun 19, 2019 8:01 pm
Forum: Infrastructure/Transport Development
Topic: [PRO] Torrens Road Grade Separation
Replies: 31
Views: 3456

[PRO] Re: Torrens Road Grade Separation

If so, the ramp may need to climb to about 8 metres above the railway to allow clearance for double-stacked freight trains as well as the thickness of the bridge deck. The start of the ramp would already be about 2 metres above the level of the railway line, which means it needs to climb another 6 ...