Search found 117 matches

by Bacon
Fri Aug 07, 2020 12:43 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] M2 North-South Motorway
Replies: 6187
Views: 1502196

[U/C] Re: M2 North-South Motorway

R2P: Northbound surface road is now open past regency
CC12A322-C387-4F02-BA51-C1355E545081.jpeg
by Bacon
Mon Jul 27, 2020 12:46 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] M2 North-South Motorway
Replies: 6187
Views: 1502196

[U/C] Re: M2 North-South Motorway

Bus route changes have been announced.
4DD2EAB6-4AC3-48B3-B004-021DE9C9B2F3.jpeg
PDF is on SitePodium and I assume it will be uploaded to the R2P site in due course.
by Bacon
Sun Jul 12, 2020 8:14 am
Forum: Infrastructure/Transport Development
Topic: [U/C] M2 North-South Motorway
Replies: 6187
Views: 1502196

[U/C] Re: M2 North-South Motorway

Looks like new traffic light just north of Regency Road intersection (by one of those industrial area streets) and one on the coopers corner. I wonder if there will be a temporary roundabout with traffic lights ala what was done at Grange Road This will be a temporary u-turn facility for when right...
by Bacon
Tue Jun 23, 2020 5:37 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] M2 North-South Motorway
Replies: 6187
Views: 1502196

[U/C] Re: M2 North-South Motorway

Meanwhile on R2P noise walls are going up. (Click for higher res)
55E884D6-895A-4AFA-A4F6-7E92A624F3CD.jpeg
by Bacon
Sat May 02, 2020 7:37 am
Forum: Infrastructure/Transport Development
Topic: [COM] M2 Northern Connector | 15.5km | $867m
Replies: 1200
Views: 390219

[COM] Re: [COM] Re: M2 Northern Connector | 15.5km | $867m

There's an on ramp heading north and an off ramp heading south, immediately north of the cross over of port road. Thats it. Getting on or off just before the brickworks is not an off/on ramp for port road. Three major arterials that dont have on/off access in both directions thats pretty poor. I’d ...
by Bacon
Fri Apr 24, 2020 7:41 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] M2 North-South Motorway
Replies: 6187
Views: 1502196

[U/C] Re: M2 North-South Motorway

Some drone shots from the R2P site https://r2palliance.com.au/resources/gallery https://ptpa-public-assets.s3.amazonaws.com/resized/generalimages/Gallery/12905/R2P-Drone-26-03-20-38_c9303cd6c839617505529966bc1ff01c.jpg https://ptpa-public-assets.s3.amazonaws.com/resized/generalimages/Gallery/12904/R...
by Bacon
Mon Apr 20, 2020 12:34 pm
Forum: Infrastructure/Transport Development
Topic: [COM] M2 Northern Connector | 15.5km | $867m
Replies: 1200
Views: 390219

[COM] Re: M2 Northern Connector | 15.5km | $867m

Southern interchange north-south is now bumped up to 90
by Bacon
Wed Apr 15, 2020 9:51 am
Forum: Infrastructure/Transport Development
Topic: [COM] M2 Northern Connector | 15.5km | $867m
Replies: 1200
Views: 390219

[COM] Re: M2 Northern Connector | 15.5km | $867m

It's likely that the lighter patches were completed months before opening whereas the darker patches were completed just before opening.
by Bacon
Fri Apr 03, 2020 9:01 am
Forum: Metropolitan Development
Topic: News & Developments: Mawson Lakes
Replies: 690
Views: 271848

Re: News & Developments: Mawson Lakes

With the Target gone I wonder how this changes the Aldi plans? Wouldn’t make much sense to build when you have a huge vacant space next door.
by Bacon
Sat Mar 21, 2020 9:38 am
Forum: Metropolitan Development
Topic: News & Developments: Prospect
Replies: 247
Views: 148649

Re: News & Developments: Prospect

d3v310per wrote:
Tue Jan 28, 2020 2:46 pm
As expected, construction continues on this site today despite Kaufland pulling the pin.
Actually the building is being dismantled. Steel frame has been removed leaving just the precast walls propped up.
by Bacon
Mon Mar 09, 2020 10:02 pm
Forum: Infrastructure/Transport Development
Topic: [COM] M2 Northern Connector | 15.5km | $867m
Replies: 1200
Views: 390219

[COM] Re: Northern Connector | 14km | $1b

Waewick wrote:
Mon Mar 09, 2020 2:45 pm
I wonder when Google maps will update with the road?
I looked into this, unless DPTI is a member of Google’s Base Map Partner Program, not a lot will happen until Google’s algorithms draw the new route. For example with t2t it took a few weeks to be properly formed in maps.
by Bacon
Thu Feb 20, 2020 4:32 pm
Forum: Infrastructure/Transport Development
Topic: [COM] M2 Northern Connector | 15.5km | $867m
Replies: 1200
Views: 390219

[COM] Re: Northern Connector | 14km | $1b

Can someone please explain the arrangement with service centres in context of the Northern Connector? Did the Government deem it necessary that at some point along the NC there should be a fuel stop, with the easiest way of achieving this designing the off ramp to go right past the OTR? or Did Pereg...
by Bacon
Wed Jan 29, 2020 4:02 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] M2 North-South Motorway
Replies: 6187
Views: 1502196

[U/C] Re: North-South Motorway

Thinking outside the square, was it ever considered to split the N-S route to reduce the footprint and potentially land acquisition costs? Example: Southbound 3 lanes trench/cut and cover from T2T to Tonsley - Following South road alignment Northbound 3 lanes trench/cut and cover from Darlington to ...
by Bacon
Fri Jan 24, 2020 7:25 am
Forum: Infrastructure/Transport Development
Topic: [COM] Goodwood/Springbank/Daws Road Intersection Upgrade
Replies: 178
Views: 76821

[COM] Re: Goodwood/Springbank/Daws Road Intersection

NYG wrote:
Thu Jan 23, 2020 11:42 pm
ChillyPhilly wrote:Peter Van the Party Man to close permanently.
Thought he was moving to another location?
Govt decided to buy the business out rather than pay for the relocation.
by Bacon
Fri Jan 03, 2020 8:27 pm
Forum: Infrastructure/Transport Development
Topic: [COM] M2 Northern Connector | 15.5km | $867m
Replies: 1200
Views: 390219

[COM] Re: Northern Connector | 14km | $1b

The end state has no right turn provided from northbound PWR to northbound NExy. It has to close permanently some time in the next two months. The southbound NExy to NC needs to be built across the alignment of that ramp before it can open. It's already built, all they need to do move the barriers ...