That seems unlikely, last year Adelaide Uni comprehensively shelved any infrastructure development for the next 5-10 years, aside from urgent maintenance.
Search found 186 matches
- Thu Feb 04, 2021 2:36 pm
- Forum: CBD Development
- Topic: [SWP] Lot 14 (Old RAH Site)
- Replies: 1052
- Views: 338542
[SWP] Re: Lot 14 (Old RAH Site)
- Thu Jan 28, 2021 10:26 am
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166677
[COM] Re: SAHMRI Stage 2
I spoke to one of the lads out the front yesterday. That step out in the soil isn't for the tent to sit, but the location of more contaminated soil. Apparently there were some tanks in that location. makes sense, I guess that's why the tent has to be located on that spot. Did they say anything abou...
- Mon Jan 25, 2021 3:05 pm
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166677
[COM] Re: SAHMRI Stage 2
I was wondering why the excavation work along the southern wall had a small kink in it - turns out it's so the tent can fit properly.
- Mon Jan 18, 2021 2:52 pm
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166677
- Mon Jan 11, 2021 11:29 am
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166677
[COM] Re: SAHMRI Stage 2
The piling rig has departed for now & the remaining excavation is moving along at a pretty quick pace.
- Mon Nov 16, 2020 10:11 am
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166677
[COM] Re: SAHMRI Stage 2
Crane base is at the back left by the looks of it. It looks to be outside the future building footprint, so I'm assuming that eventually the concrete cube it's sitting on will be covered over by paving / landscaping when everything's complete. The piling rig has worked its way around the whole bound...
- Wed Nov 11, 2020 10:50 am
- Forum: Infrastructure/Transport Development
- Topic: [U/C] M2 North-South Motorway
- Replies: 6192
- Views: 1505270
[U/C] Re: M2 North-South Motorway
The project includes: A 4.3km southern tunnel from Darlington to just south of the Glenelg Tram bridge 1km of lowered motorway under the Glenelg Tram line and Anzac Highway 2km surface motorway from Anzac Highway to just south of Richmond Road then a lowered motorway under Richmond Road A 2km north...
- Fri Oct 02, 2020 1:45 pm
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166677
[COM] Re: SAHMRI Stage 2
Nice photo. Does anyone know how long the screw on those rigs last? Can they be refurbished or do they become scrap once they have worn out? Where are they made? Are they a single piece top to bottom or are there several bits screwed together with a cutting point on the bottom? No idea about the lo...
- Fri Oct 02, 2020 11:15 am
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166677
- Tue Sep 29, 2020 9:55 am
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166677
[COM] Re: SAHMRI Stage 2
it looks like some some rebar piling cages have appeared on the site (on the right hand side). A curious trench has also been dug around the North Terrace edge and filled with what look like foam blocks which are being cemented in place. A vibration suppression strategy maybe? https://i.imgur.com/vk...
- Mon Sep 21, 2020 11:11 am
- Forum: CBD Development
- Topic: [COM] SAHMRI Stage 2
- Replies: 358
- Views: 166677
[COM] Re: SAHMRI Stage 2
Definitely getting closer to the next construction phase. Even with the filling & leveling of the holes that were dug to remove contaminated soil etc, there's still a fairly large drop (about 5m) from the front of the site to the back corner, so there might not be much more re-excavation require...
- Fri Sep 18, 2020 3:04 pm
- Forum: CBD Development
- Topic: [VIS] New inner-city stadium
- Replies: 244
- Views: 72461
[VIS] Re: New inner-city stadium
Also as alluded to earlier, the last time a stadium had moving parts they couldn't even lift a bunch of lightbulbs. But hey, let's go for a 120m * 70m football pitch :lol: Tottenham has just built a brand new slide in / slide out pitch. It's made of three 30x100m segments and weighs just under 10,0...
- Mon Sep 14, 2020 9:14 pm
- Forum: Infrastructure/Transport Development
- Topic: [U/C] M2 North-South Motorway
- Replies: 6192
- Views: 1505270
[U/C] Re: M2 North-South Motorway
The 'new' South Rd / Grange Rd intersection occupies an area about 85m X 85m. A similar designed intersection at HBR won't quite fit with the existing road alignment if you want to preserve the Thebby & the school opposite, but if you shifted that bit of HBR south by 20-30m it'll fit much more e...
- Fri Sep 04, 2020 10:02 am
- Forum: Infrastructure/Transport Development
- Topic: [U/C] M2 North-South Motorway
- Replies: 6192
- Views: 1505270
[U/C] Re: M2 North-South Motorway
Yesterday afternoon there was a drilling rig set up in the wide median strip on the western side of South Rd at Hindmarsh (ie the bit separating South Road from the Brickworks shopping center). It could be there for core sampling etc.
- Thu Aug 20, 2020 8:05 pm
- Forum: CBD Development
- Topic: [COM] 104-106 Currie Street | 117m | 33lvl | Sofitel Hotel
- Replies: 845
- Views: 374902
[COM] Re: 104-106 Currie Street | 117m | 33lvl | Sofitel Hotel
taken earlier this evening: