Search found 186 matches

by Listy
Thu Feb 04, 2021 2:36 pm
Forum: CBD Development
Topic: [SWP] Lot 14 (Old RAH Site)
Replies: 1052
Views: 338542

[SWP] Re: Lot 14 (Old RAH Site)

Mpol02 wrote:
Wed Feb 03, 2021 2:20 am
If the ADL university redevelopment happens, north terrace will be quite the place for some great design.
That seems unlikely, last year Adelaide Uni comprehensively shelved any infrastructure development for the next 5-10 years, aside from urgent maintenance.
by Listy
Thu Jan 28, 2021 10:26 am
Forum: CBD Development
Topic: [COM] SAHMRI Stage 2
Replies: 358
Views: 166677

[COM] Re: SAHMRI Stage 2

I spoke to one of the lads out the front yesterday. That step out in the soil isn't for the tent to sit, but the location of more contaminated soil. Apparently there were some tanks in that location. makes sense, I guess that's why the tent has to be located on that spot. Did they say anything abou...
by Listy
Mon Jan 25, 2021 3:05 pm
Forum: CBD Development
Topic: [COM] SAHMRI Stage 2
Replies: 358
Views: 166677

[COM] Re: SAHMRI Stage 2

I was wondering why the excavation work along the southern wall had a small kink in it - turns out it's so the tent can fit properly.
Image
by Listy
Mon Jan 18, 2021 2:52 pm
Forum: CBD Development
Topic: [COM] SAHMRI Stage 2
Replies: 358
Views: 166677

[COM] Re: SAHMRI Stage 2

Growl3r wrote:
Tue Jan 12, 2021 10:43 am
I wonder if they will bring the vapour enclosure back???
Yep, the vent tent is making a comeback :)
Image
by Listy
Mon Jan 11, 2021 11:29 am
Forum: CBD Development
Topic: [COM] SAHMRI Stage 2
Replies: 358
Views: 166677

[COM] Re: SAHMRI Stage 2

The piling rig has departed for now & the remaining excavation is moving along at a pretty quick pace.

Image
by Listy
Mon Nov 16, 2020 10:11 am
Forum: CBD Development
Topic: [COM] SAHMRI Stage 2
Replies: 358
Views: 166677

[COM] Re: SAHMRI Stage 2

Crane base is at the back left by the looks of it. It looks to be outside the future building footprint, so I'm assuming that eventually the concrete cube it's sitting on will be covered over by paving / landscaping when everything's complete. The piling rig has worked its way around the whole bound...
by Listy
Wed Nov 11, 2020 10:50 am
Forum: Infrastructure/Transport Development
Topic: [U/C] M2 North-South Motorway
Replies: 6192
Views: 1505270

[U/C] Re: M2 North-South Motorway

The project includes: A 4.3km southern tunnel from Darlington to just south of the Glenelg Tram bridge 1km of lowered motorway under the Glenelg Tram line and Anzac Highway 2km surface motorway from Anzac Highway to just south of Richmond Road then a lowered motorway under Richmond Road A 2km north...
by Listy
Fri Oct 02, 2020 1:45 pm
Forum: CBD Development
Topic: [COM] SAHMRI Stage 2
Replies: 358
Views: 166677

[COM] Re: SAHMRI Stage 2

Nice photo. Does anyone know how long the screw on those rigs last? Can they be refurbished or do they become scrap once they have worn out? Where are they made? Are they a single piece top to bottom or are there several bits screwed together with a cutting point on the bottom? No idea about the lo...
by Listy
Fri Oct 02, 2020 11:15 am
Forum: CBD Development
Topic: [COM] SAHMRI Stage 2
Replies: 358
Views: 166677

[COM] Re: SAHMRI Stage 2

Image
by Listy
Tue Sep 29, 2020 9:55 am
Forum: CBD Development
Topic: [COM] SAHMRI Stage 2
Replies: 358
Views: 166677

[COM] Re: SAHMRI Stage 2

it looks like some some rebar piling cages have appeared on the site (on the right hand side). A curious trench has also been dug around the North Terrace edge and filled with what look like foam blocks which are being cemented in place. A vibration suppression strategy maybe? https://i.imgur.com/vk...
by Listy
Mon Sep 21, 2020 11:11 am
Forum: CBD Development
Topic: [COM] SAHMRI Stage 2
Replies: 358
Views: 166677

[COM] Re: SAHMRI Stage 2

Definitely getting closer to the next construction phase. Even with the filling & leveling of the holes that were dug to remove contaminated soil etc, there's still a fairly large drop (about 5m) from the front of the site to the back corner, so there might not be much more re-excavation require...
by Listy
Fri Sep 18, 2020 3:04 pm
Forum: CBD Development
Topic: [VIS] New inner-city stadium
Replies: 244
Views: 72461

[VIS] Re: New inner-city stadium

Also as alluded to earlier, the last time a stadium had moving parts they couldn't even lift a bunch of lightbulbs. But hey, let's go for a 120m * 70m football pitch :lol: Tottenham has just built a brand new slide in / slide out pitch. It's made of three 30x100m segments and weighs just under 10,0...
by Listy
Mon Sep 14, 2020 9:14 pm
Forum: Infrastructure/Transport Development
Topic: [U/C] M2 North-South Motorway
Replies: 6192
Views: 1505270

[U/C] Re: M2 North-South Motorway

The 'new' South Rd / Grange Rd intersection occupies an area about 85m X 85m. A similar designed intersection at HBR won't quite fit with the existing road alignment if you want to preserve the Thebby & the school opposite, but if you shifted that bit of HBR south by 20-30m it'll fit much more e...
by Listy
Fri Sep 04, 2020 10:02 am
Forum: Infrastructure/Transport Development
Topic: [U/C] M2 North-South Motorway
Replies: 6192
Views: 1505270

[U/C] Re: M2 North-South Motorway

Yesterday afternoon there was a drilling rig set up in the wide median strip on the western side of South Rd at Hindmarsh (ie the bit separating South Road from the Brickworks shopping center). It could be there for core sampling etc.