#46 Post by ml69 » Mon Apr 01, 2019 12:44 pm

1NEEDS2POST wrote:
Sat Mar 30, 2019 10:27 pm
There are TBMs that can dig diagonally down for escalator shafts. Here is an article on one used for the St Petersburg Metro: https://www.tunneltalk.com/TunnelTech-A ... alator.php
Why couldn’t they build escalators within that 25m diameter shaft? Yes it will have to zig zag multiple times down to the platform level (much like escalators in a department store) but surely there would be room for it and much better than elevators only.

Also more simple than excavating a separate shaft for an escalator.

ml69
Legendary Member!
Posts: 824
Joined: Mon Jan 03, 2011 11:16 pm
Location: Adelaide SA
Has thanked: 85 times
Been thanked: 66 times

Re: Vision: CBD Underground Rail Loop

#47 Post by ml69 » Mon Apr 01, 2019 12:51 pm

I like the idea of a really big 2-level rail tunnel with station incorporated into the tunnel itself.

It mitigates a big concern of mine which was whether we could afford a rail tunnel with multiple CBD stations due to the enormous cost of constructing the underground stations. With this arrangement, station construction is quite straight-forward job.

I was thinking ideal locations for the station entrances (the 25m wide shaft) could be:

- Adelaide (Underground) station: the plaza in front of the Intercontinental (maybe some underground parking might have to be demolished). This could then link to the existing station.

- Hindmarsh Square station: on the southwestern portion of Hindmarsh Square, servicing the eastern part of the CBD. Alternatively as Nort suggested, where the current Rundle St U-Park is located.

- Victoria Square station: on the southern portion of Vic Square, adjacent the existing tram stop. Allows easy transfers.

Westside
High Rise Poster!
Posts: 204
Joined: Tue May 12, 2009 4:30 pm
Has thanked: 13 times
Been thanked: 38 times

Re: Vision: CBD Underground Rail Loop

#48 Post by Westside » Mon Apr 08, 2019 12:54 pm

ml69 wrote:
Mon Apr 01, 2019 12:44 pm
1NEEDS2POST wrote:
Sat Mar 30, 2019 10:27 pm
There are TBMs that can dig diagonally down for escalator shafts. Here is an article on one used for the St Petersburg Metro: https://www.tunneltalk.com/TunnelTech-A ... alator.php
Why couldn’t they build escalators within that 25m diameter shaft? Yes it will have to zig zag multiple times down to the platform level (much like escalators in a department store) but surely there would be room for it and much better than elevators only.

Also more simple than excavating a separate shaft for an escalator.
What? How else do you get between the surface and the rail tunnel? The 25m wide tunnel is horizontal at many metres below the surface, you then use small tunnels to connect between that and the surface.

Having said that, cut and cover is still by far the cheapest method, with possibly some small Tunnel-Bored segments in-between where needed. You just need to carefully locate stations along existing roadways or empty (or cheap to demolish) lots. Even in Sydney, they saved a heap of $$ for their NW metro by using smaller tunnels (to accommodate only single-deck trains, not the traditional double-stack). So I wouldn't assume that this method is the panacea of options out there. Having not opened some 17 years later is testament to that.

User avatar
1NEEDS2POST
High Rise Poster!
Posts: 152
Joined: Tue Jun 26, 2018 5:01 pm
Has thanked: 27 times
Been thanked: 25 times

Re: Vision: CBD Underground Rail Loop

#49 Post by 1NEEDS2POST » Tue Apr 16, 2019 6:54 pm

The higher (or deeper) you go, the more advantage lifts have. Escalators run at a fixed speed, which is slow in Western litigious countries. Lifts can accelerate and decelerate, which gives them an advantage over longer distances.
Westside wrote:
Mon Apr 08, 2019 12:54 pm
Having said that, cut and cover is still by far the cheapest method, with possibly some small Tunnel-Bored segments in-between where needed. You just need to carefully locate stations along existing roadways or empty (or cheap to demolish) lots. Even in Sydney, they saved a heap of $$ for their NW metro by using smaller tunnels (to accommodate only single-deck trains, not the traditional double-stack). So I wouldn't assume that this method is the panacea of options out there. Having not opened some 17 years later is testament to that.
Once a TBM is up and running, its costs are small. Cut and cover is cheaper, but if you can't use cut and cover for the whole route, that's when the costs escalate. I can't see how we can have corners in a CBD rail tunnel that are cut and cover, unless the corners are in the parklands.