Crane Counter: CBD 8 | Metro 8 | Total 16

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
ghs
Super Size Scraper Poster!
Posts: 1725
Joined: Thu Sep 18, 2008 8:09 am
Location: Brighton

Re: Official CBD Crane Counter Thread - 6

#931 Post by ghs » Sun May 03, 2015 9:07 am

Updated List :
Attachments
adelaide.jpg
adelaide.jpg (271.02 KiB) Viewed 6743 times

Walkinshaw
Sen-Rookie-Sational
Posts: 33
Joined: Thu Aug 25, 2005 7:25 pm
Location: Adelaide

Re: Official CBD Crane Counter Thread - 15

#932 Post by Walkinshaw » Tue May 05, 2015 10:27 pm

Ben wrote:Lots of big projects underway and about to commence exciting times. I don't ever remember this many projects at or about to commence construction phase. We had had heaps of proposals but this is by far going to be one of the biggest 24 months periods in terms of both height and quantity. Can't wait!

In the next 3 months we should see cranes for Central Adelaide, Palladium, U2, a number of South Terrace proposals, convention centre, possibly Uni SA, 1 or even 2 at Mayfield and maybe more if the hotels commence too.
No fixed tower cranes planned for Convention Ctr

Smithy85
High Rise Poster!
Posts: 274
Joined: Mon Jan 26, 2015 11:31 am

Re: Official CBD Crane Counter Thread - 15

#933 Post by Smithy85 » Wed May 06, 2015 7:37 pm

Walkinshaw wrote:
Ben wrote:Lots of big projects underway and about to commence exciting times. I don't ever remember this many projects at or about to commence construction phase. We had had heaps of proposals but this is by far going to be one of the biggest 24 months periods in terms of both height and quantity. Can't wait!

In the next 3 months we should see cranes for Central Adelaide, Palladium, U2, a number of South Terrace proposals, convention centre, possibly Uni SA, 1 or even 2 at Mayfield and maybe more if the hotels commence too.
No fixed tower cranes planned for Convention Ctr
This link suggests otherwise: http://dpti.sa.gov.au/infrastructure/ma ... atest_news

"Crane pad works – Riverbank lawn (adjacent river)

A crane pad and associated works compound is being setup in the grassed area between the Convention Centre and Linear Park path (see map below). .

There will be four months of civil works to prepare the area, and then a 200 tonne crane is expected to be in operation in June 2015..

The crane will be in this location until approximately the end of 2016.."

Walkinshaw
Sen-Rookie-Sational
Posts: 33
Joined: Thu Aug 25, 2005 7:25 pm
Location: Adelaide

Re: Official CBD Crane Counter Thread - 15

#934 Post by Walkinshaw » Fri May 08, 2015 5:31 pm

Smithy85 wrote:
Walkinshaw wrote:
Ben wrote:Lots of big projects underway and about to commence exciting times. I don't ever remember this many projects at or about to commence construction phase. We had had heaps of proposals but this is by far going to be one of the biggest 24 months periods in terms of both height and quantity. Can't wait!

In the next 3 months we should see cranes for Central Adelaide, Palladium, U2, a number of South Terrace proposals, convention centre, possibly Uni SA, 1 or even 2 at Mayfield and maybe more if the hotels commence too.
No fixed tower cranes planned for Convention Ctr
This link suggests otherwise: http://dpti.sa.gov.au/infrastructure/ma ... atest_news

"Crane pad works – Riverbank lawn (adjacent river)

A crane pad and associated works compound is being setup in the grassed area between the Convention Centre and Linear Park path (see map below). .

There will be four months of civil works to prepare the area, and then a 200 tonne crane is expected to be in operation in June 2015..

The crane will be in this location until approximately the end of 2016.."
Crane Pad will be utilised by crawler + hydraulic mobiles, no fixed towers to be utilised.

Smithy85
High Rise Poster!
Posts: 274
Joined: Mon Jan 26, 2015 11:31 am

Re: Official CBD Crane Counter Thread - 6

#935 Post by Smithy85 » Sat May 16, 2015 9:05 am

Final RAH crane coming down today.

EBG
Super Size Scraper Poster!
Posts: 2961
Joined: Fri Jul 12, 2013 10:49 pm

Re: Official CBD Crane Counter Thread - 6

#936 Post by EBG » Sun May 17, 2015 11:01 pm

No more RAH Cranes.
Attachments
20150516_last RAH cr.jpg
20150516_last RAH cr.jpg (136.45 KiB) Viewed 6082 times

Smithy85
High Rise Poster!
Posts: 274
Joined: Mon Jan 26, 2015 11:31 am

Re: Official CBD Crane Counter Thread - 5

#937 Post by Smithy85 » Fri Jul 31, 2015 7:30 pm

6 :D

ghs
Super Size Scraper Poster!
Posts: 1725
Joined: Thu Sep 18, 2008 8:09 am
Location: Brighton

Re: Official CBD Crane Counter Thread - 6

#938 Post by ghs » Mon Aug 03, 2015 11:02 pm

Updated List. 39 Buildings either Topped Out, UC, SWP, Sales, Approved or Proposed. More
to come as well over the next few months, we should get up to 50 I think by the end of the year.
Attachments
adelaide.jpg
adelaide.jpg (306.92 KiB) Viewed 5516 times

User avatar
slenderman
High Rise Poster!
Posts: 410
Joined: Mon Sep 30, 2013 8:44 am

Re: Official CBD Crane Counter Thread - 6

#939 Post by slenderman » Tue Aug 04, 2015 5:00 pm

Nice work ghs. I might make my own version of this so I can keep track of the developments as they come up. There's a couple you've missed, although they're mostly ones that have gone quiet and probably won't go ahead (such as Queen Adelaide Club, Gawler Chambers, watered down Palladio, 261-263 Pulteney Street), but still a super nice and helpful effort. Thanks.

When did Adelaide have a list of proposals this long? Of course there's a difference between what's proposed and what's actually built, but still.

ghs
Super Size Scraper Poster!
Posts: 1725
Joined: Thu Sep 18, 2008 8:09 am
Location: Brighton

Re: Official CBD Crane Counter Thread - 6

#940 Post by ghs » Tue Aug 04, 2015 5:47 pm

slenderman wrote:Nice work ghs. I might make my own version of this so I can keep track of the developments as they come up. There's a couple you've missed, although they're mostly ones that have gone quiet and probably won't go ahead (such as Queen Adelaide Club, Gawler Chambers, watered down Palladio, 261-263 Pulteney Street), but still a super nice and helpful effort. Thanks.

When did Adelaide have a list of proposals this long? Of course there's a difference between what's proposed and what's actually built, but still.
Thanks man, I enjoy putting it together and I'll provide an update every 3 months. I remember posting a list about 12 months ago and the list was only
about half as long. In answer to your question, Adelaide never would have had a list of proposal like this before. You make a good point though as this
stage there's a lot more buildings which are proposed / approved then SWP / UC. Still there's a lot happening this year compared to last year.

Smithy85
High Rise Poster!
Posts: 274
Joined: Mon Jan 26, 2015 11:31 am

Re: Official CBD Crane Counter Thread - 6

#941 Post by Smithy85 » Tue Aug 04, 2015 6:41 pm

Next crane should be UniSA building, then either New Mayfield or Palladium on Light. After that probably one of the South Tce buildings.

Fantastic to see that list so long and hopefully keep growing!

Ben
VIP Member
VIP Member
Posts: 7480
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

Re: Official CBD Crane Counter Thread - 15

#942 Post by Ben » Mon Aug 10, 2015 2:15 pm

In the next 3 months we should see cranes for Palladium, U2, a number of South Terrace proposals, Uni SA, 1 or even 2 at Mayfield and maybe more if the hotels commence too. Bohem is likely to start in October as is East Park Kent town and August Towers. We will likely be at double digits again going into 2016.
Location...........................Levels............Crane

Completed 2015

50 Flinders Street...........................................16
271-281 Gouger Street (Aria)..............................12
Hume Street.................................................8


Under Construction

413 King William Street....................................28 (89m)............................1
115 King William Street....................................26 (90m)............................1
114 Waymouth Street......................................24
69-71 Light Square..........................................19
152-160 Grote Street .....................................19.....................................1
176-186 Morphett Street ................................16.....................................1
Uni SA, North Terrace.....................................16
262 South Terrace......................................15
Uni of Adelaide, North Terrace..........................13.....................................2
43-69 Sturt Street (Stage 1).............................10
Convention Centre Stage 2
New Royal Adelaide Hospital

Commencing September 2015


Holiday Inn Express Hindley Street...................13
111 South Terrace (Citi)................................11



Commencing October 2015


150 Wright Street (Bohem)..............................23
43-69 Sturt Street (Stage 2)...........................15
316 South Terrace (August Towers)..................14
Ascend Hotel West Terrace...........................14

TOTAL CBD CRANES:..................................6


Approved/Proposed Upcoming

123 Flinders Street.....................................39 (135m) (ONH)
51 Pirie Street...........................................30 (115m) (PRO)
Sofitel Currie Street....................................32 (110m) (APP)
29 Angus Street..........................................30 (~100m) (PRO)
2-20 Flinders Street.....................................27 (100m) (ONH)
Renaissance Arcade.....................................30 (94m)
126 Wakefield Street....................................27 (~93m) (PRO)
260 Flinders Street......................................25/23
157 Waymouth Street...................................23
43-69 Sturt Street (Stage 3)............................17
124 Franklin street......................................15


Completed 2008

Spark Hindley Street..................................15
Lot 8 Coglin St...........................................13
SA Water..................................................11
Tivoli........................................................10
IPAD..........................................................9
Thompson Playford Gouger St.......................8
The Precinct (Gallery).................................7


Completed 2009

Conservatory on Hindmarsh.........................18
The Precinct Tower 1 (Altitude)...................18
20 Hindmarsh Square (Apartment).................15
Aurora Building East ...................................14
Wave KW Street.........................................12
Edge KW Street..........................................11
374 - 400 King William St ..............................11
Adelaide Uni Engeneering Building..................8


Completed 2010

140 North Terrace ....................................20/18
20 Hindmarsh Square (Hotel).......................16
235 - 237 Pirie St (Freedom Apartments)........8
Ifould st Apartments...................................8


Completed 2011

Globe Apartments...........................................15
Yorke Campus (Police Headquarters)...................10
58-76 Franklin Street (Carpark)..........................10
42 - 56 Franklin St (Carpark)..............................8
Women's and Children's Hospital Children's..........6 (3 new)


Completed 2012

City Central 8................................................21
102 Waymouth St ...........................................17
12-14 Rowlands Place......................................17
58-76 Franklin Street (Office)...........................19
58-76 Franklin Street (Apartments)....................16
111-115 South Terrace ....................................8
74 Light Square...............................................8
Illumin8..........................................................6


Completed 2013

Rundle Place.................................................17
UNI SA Hindley Street......................................8
147-151 Flinders Street....................................8
Medical Reasearch Institute - North Terrace............6


Completed 2014

122 Grenfell Street........................................17
242-244 Flinders Street ..................................14
379 King William Street....................................13
Mellor Street.................................................12
Adelaide Oval Redevelopment
Convention Centre Redevelopment - Stage 1
CML > Mayfair hotel

ghs
Super Size Scraper Poster!
Posts: 1725
Joined: Thu Sep 18, 2008 8:09 am
Location: Brighton

Re: Official CBD Crane Counter Thread - 6

#943 Post by ghs » Sun Aug 16, 2015 10:19 pm

Agree with most of your comments Ben, but I am not so sure about Bohem and U2 on Waymouth
getting cranes in the next 3 months. I would say these two projects are more likely to startup next
year mate.

Ben
VIP Member
VIP Member
Posts: 7480
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

Re: Official CBD Crane Counter Thread - 15

#944 Post by Ben » Wed Sep 16, 2015 11:23 am

September update.

Not sure what is happening with Palladium - hopefully some proper construction and a crane by years end as there is no basement levels. Uni SA appear to be setting up 2 crane pits. So hopefully we will have atleast one if not 2 at this site by years end. U2, Mayfield, East Park, Citi apartments, Holiday Inn and Bohem are all possibilities as well depending on how fast they move. 2016 looks to be a massive year for Adelaide construction. Perhaps our largest yet.

Location...........................Levels............Crane

Completed 2015

50 Flinders Street...........................................16
271-281 Gouger Street (Aria)..............................12
Hume Street.................................................8


Under Construction

413 King William Street....................................28 (89m)............................1
115 King William Street....................................26 (90m)............................1
114 Waymouth Street (U2).................................24
69-71 Light Square..........................................19
152-160 Grote Street .....................................19.....................................1
176-186 Morphett Street ................................16.....................................1
Uni SA, North Terrace.....................................16
262 South Terrace......................................15
Uni of Adelaide, North Terrace..........................13.....................................2
43-69 Sturt Street (Stage 1).............................10
Convention Centre Stage 2
New Royal Adelaide Hospital


Commencing October 2015


Holiday Inn Express Hindley Street...................13
111 South Terrace (Citi)................................11



Commencing November 2015


150 Wright Street (Bohem)..............................23
43-69 Sturt Street (Stage 2)...........................15
316 South Terrace (August Towers)..................14
Ascend Hotel West Terrace...........................14
East Park - Kent Town.................................11

TOTAL CBD CRANES:..................................6


Approved/Proposed Upcoming

51 Pirie Street...........................................40 (150m) (PRO)
123 Flinders Street.....................................39 (135m) (ONH)
51 Pirie Street...........................................30 (115m) (PRO)
Sofitel Currie Street....................................32 (110m) (APP)
27 Angus Street..........................................30 (~100m) (PRO)
2-20 Flinders Street.....................................27 (100m) (ONH)
Renaissance Arcade.....................................30 (94m)
126 Wakefield Street....................................27 (~93m) (PRO)
260 Flinders Street......................................25/23
157 Waymouth Street...................................23
West Franklin.............................................21/19
43-69 Sturt Street (Stage 3)............................17



Completed 2008

Spark Hindley Street..................................15
Lot 8 Coglin St...........................................13
SA Water..................................................11
Tivoli........................................................10
IPAD..........................................................9
Thompson Playford Gouger St.......................8
The Precinct (Gallery).................................7


Completed 2009

Conservatory on Hindmarsh.........................18
The Precinct Tower 1 (Altitude)...................18
20 Hindmarsh Square (Apartment).................15
Aurora Building East ...................................14
Wave KW Street.........................................12
Edge KW Street..........................................11
374 - 400 King William St ..............................11
Adelaide Uni Engeneering Building..................8


Completed 2010

140 North Terrace ....................................20/18
20 Hindmarsh Square (Hotel).......................16
235 - 237 Pirie St (Freedom Apartments)........8
Ifould st Apartments...................................8


Completed 2011

Globe Apartments...........................................15
Yorke Campus (Police Headquarters)...................10
58-76 Franklin Street (Carpark)..........................10
42 - 56 Franklin St (Carpark)..............................8
Women's and Children's Hospital Children's..........6 (3 new)


Completed 2012

City Central 8................................................21
102 Waymouth St ...........................................17
12-14 Rowlands Place......................................17
58-76 Franklin Street (Office)...........................19
58-76 Franklin Street (Apartments)....................16
111-115 South Terrace ....................................8
74 Light Square...............................................8
Illumin8..........................................................6


Completed 2013

Rundle Place.................................................17
UNI SA Hindley Street......................................8
147-151 Flinders Street....................................8
Medical Reasearch Institute - North Terrace............6


Completed 2014

122 Grenfell Street........................................17
242-244 Flinders Street ..................................14
379 King William Street....................................13
Mellor Street.................................................12
Adelaide Oval Redevelopment
Convention Centre Redevelopment - Stage 1
CML > Mayfair hotel

EBG
Super Size Scraper Poster!
Posts: 2961
Joined: Fri Jul 12, 2013 10:49 pm

Re: Official CBD Crane Counter Thread - 6

#945 Post by EBG » Wed Sep 16, 2015 9:47 pm

A picture (from 12 Sept) of the crawler crane at the convention centre showing it fully extended. When not working the red and white section is folded down against the black tower section.
Attachments
20150912_convention centre.jpg
20150912_convention centre.jpg (216.21 KiB) Viewed 4716 times

Post Reply

Who is online

Users browsing this forum: Amazon [Bot], Google Adsense [Bot] and 71 guests