[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Fri Jun 19, 2020 1:37 pm
by Mr Smith
Patrick_27 wrote:
Fri Jun 19, 2020 12:13 am
Makes you wonder why taller buildings can get up in strange pockets of the city (like CBD east) meanwhile there seems to be this stunted growth with those buildings along Waymouth/Pirie and Currie/Grenfell. This building looks great but would have looked better with a podium spanning the whole site and a slimmer tower on top add 25m to the roof.

Agreed. But make that +100m, 25m it will barely clear Telstra and Grenfell tower esp when viewed from the north.

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Fri Jun 19, 2020 3:25 pm
by cmet
Patrick_27 wrote:Makes you wonder why taller buildings can get up in strange pockets of the city (like CBD east) meanwhile there seems to be this stunted growth with those buildings along Waymouth/Pirie and Currie/Grenfell. This building looks great but would have looked better with a podium spanning the whole site and a slimmer tower on top add 25m to the roof.
Because it’s more expensive to build a taller and slim building than build one with the same NLA shorter and fatter. Im guessing some of the resi towers have been taller recently as people typically don’t want to live on the same floor as 10 other appartments, so taller and less appartments per floor is more appealing.

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Wed Aug 26, 2020 11:03 am
by AG
I noticed that some of the contracts are starting to be awarded on this project - also looks like the building has been shaved down slightly to 21 levels (ground level, 3 car park levels plus 17 office levels) from the original 22 by Cbus. Don't think a contractor has been appointed just yet, but I suspect not far off.

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Thu Aug 27, 2020 12:48 pm
by Capbld
AG wrote:
Wed Aug 26, 2020 11:03 am
I noticed that some of the contracts are starting to be awarded on this project - also looks like the building has been shaved down slightly to 21 levels (ground level, 3 car park levels plus 17 office levels) from the original 22 by Cbus. Don't think a contractor has been appointed just yet, but I suspect not far off.
What contracts are you referring to?

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Wed Sep 16, 2020 7:55 pm
by MR_T
Anyone know the the builder is? MULTI OR HY???

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Thu Oct 08, 2020 2:40 pm
by MR_T
Anyone know the appointed / preferred builder

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Thu Oct 08, 2020 6:19 pm
by Norman
MR_T wrote:
Thu Oct 08, 2020 2:40 pm
Anyone know the appointed / preferred builder
There is no need to post twice. Once the builder is known I'm sure it will be posted up here.

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Thu Oct 08, 2020 6:48 pm
by timtam20292
MR_T wrote:
Thu Oct 08, 2020 2:40 pm
Anyone know the appointed / preferred builder
:wallbash:

[COM] Re: [APP] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Thu Oct 08, 2020 8:04 pm
by citywatcher
Norman wrote:
MR_T wrote:
Thu Oct 08, 2020 2:40 pm
Anyone know the appointed / preferred builder
There is no need to post twice. Once the builder is known I'm sure it will be posted up here.
You can't talk like that to Mr T Image

Sent from my SM-A515F using Tapatalk


[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Thu Oct 08, 2020 9:36 pm
by Jaymz
timtam20292 wrote:
Thu Oct 08, 2020 6:48 pm
MR_T wrote:
Thu Oct 08, 2020 2:40 pm
Anyone know the appointed / preferred builder
:wallbash:
What's the point of this post? it's far less informative and useful than what Mr. T even had to say :?:

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Fri Oct 09, 2020 3:08 am
by timtam20292
Jaymz wrote:
Thu Oct 08, 2020 9:36 pm
timtam20292 wrote:
Thu Oct 08, 2020 6:48 pm
MR_T wrote:
Thu Oct 08, 2020 2:40 pm
Anyone know the appointed / preferred builder
:wallbash:
What's the point of this post? it's far less informative and useful than what Mr. T even had to say :?:
Clearly it is in response to the unnecessary thread bump. Honestly, could you not work that out?

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Fri Oct 09, 2020 4:16 am
by MR_T
Apparently MULTIPLEX awarded as builder with demolition commencement Monday 12-10-20.

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Wed Oct 14, 2020 3:00 pm
by MR_T
- multiplex awarded as builder
- delta group onsite starting demolition today


Sent from my iPhone using Tapatalk

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Thu Oct 15, 2020 8:19 am
by matthawke
My office is on the 9th floor of 63 Pirie (i.e. directly adjacent this site). Here’s a baseline / “before” shot from my vantage point — excuse window dust / reflections / etc.

Will be good watching this one go up.

[COM] Re: 73-85 Pirie Street | 89m | 22 Levels | Office

Posted: Fri Oct 16, 2020 7:42 am
by joshzxzx
matthawke wrote:
Thu Oct 15, 2020 8:19 am
My office is on the 9th floor of 63 Pirie (i.e. directly adjacent this site). Here’s a baseline / “before” shot from my vantage point — excuse window dust / reflections / etc.

Will be good watching this one go up.