getting the road out of view would also be a nice start....Vee wrote:Agree, Wayno.Wayno wrote:Excellent news. Love these Park Land facing developments. Quick sales will generate more proposals...
Park Land frontages are ideal for apartments - fantastic outlook, 'free garden' on the doorstep for exercise, fresh air etc, increased pedestrianization, cycling and day/night population adding to increased use and amenities (and safety) in the park land belt and surrounds.
I would love to see more medium rise residential also in the mix for the park land frontages on Greenhill Road, Fullarton Road/Dequettville Tce for the above reasons. Currently, there are many commercial buildings up for lease (depressing) and wasted single /double level use of valuable sites, plus these areas are relative deserts at night and on weekends.
[COM] 111-113 South Tce | 11 levels | 38m | Citi Terrace Apartment
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
The on-site sign now states over 80% sold and construction starting September 2015.
Opportunity is missed by most people because it is dressed in overalls and looks like work.
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
Always happy to see new developments going up, even if this one is far from a looker.
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
Site works have not actually started yet although there were some surveyor types on site last week. The signage states starting September so that is hopeful. Sorry about the picture taken looking into sun.
- Attachments
-
- 13 south tce.jpg (302.21 KiB) Viewed 7062 times
-
- soutth tce 2.jpg (220.48 KiB) Viewed 7062 times
Last edited by EBG on Wed Sep 30, 2015 10:10 pm, edited 1 time in total.
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
The demolition of the rear of the adjoining terrace home had to be done in order for this development to commence (I believe from what I heard that this is where the crane will be located).
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
Definitely happening soon.
Type Schedule 10
Application Number S10/43/2014/1/A
Lodgement Date 09/09/2015
Location Land, 111-115 South Terrace, ADELAIDE SA 5000
Description Vary previous authorisation to construct an 11 level residential apartment building with ground floor offices and associated car parking and landscaping - VARIATION - includes changes to number and configuration of apartments, change of use from office to cafe on ground floor and minor facade changes - STAGE 1 - SUBSTRUCTURE TO 1ST FLOOR SLAB ONLY.
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
Some workers were at the rear of the 2 story house next door with a mini excavator this morning.
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
Completely underway now.
Excavators on site, site is being cleared, a real hive of activity now!
Excavators on site, site is being cleared, a real hive of activity now!
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
Pikey is correct construction has stated. I took this picture today 5 pm on my way home. there is an excavator and a bobcat ( small tractor) on site. They said construction would start in September.
- Attachments
-
- 20150930_south tce 1.jpg (428.47 KiB) Viewed 6329 times
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
The has been dug down just a bit to get rid of the grass and tree roots and was being levelled and compacted with a roller this morning (3 Oct 2015). Sorry no picture.
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
Piling has commenced.
Also, what looks like the beginning of the crane foundations have commenced on the North/east corner of the site.
No mucking around now.
Also, what looks like the beginning of the crane foundations have commenced on the North/east corner of the site.
No mucking around now.
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
Piling is underway. I think the piles at the north east corner are just part of the foundations(?)
- Attachments
-
- 20151015_111 st 22.jpg (203.79 KiB) Viewed 6169 times
-
- 20151015_111 st 3.jpg (463.57 KiB) Viewed 6169 times
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
Piling has been completed and now the footings are being formed up. please excuse the rough edge in one picture , it is due to the shade cloth on the southern fence.
the lift/services core is roughly in the centre of the site.
the lift/services core is roughly in the centre of the site.
- Attachments
-
- 20151108_116ST.jpg (436.78 KiB) Viewed 5904 times
-
- 20151108_st 2.jpg (182.42 KiB) Viewed 5904 times
[COM] Re: 111-113 South Tce | 11 levels | 38m | Citi Terrace Apart
The southern 1/2 of the site is ready for pouring the concrete for the footings for the ground floor. note the house next door (on South Tce) seems to have lost its roof.
I thought it was been renovated but it is in a very bad state?
I thought it was been renovated but it is in a very bad state?
- Attachments
-
- 20151121_south tce 116.jpg (531.57 KiB) Viewed 5681 times