[COM] New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pulteney

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Post Reply
Message
Author
Patrick_27
Super Size Scraper Poster!
Posts: 2436
Joined: Tue Mar 05, 2013 4:41 pm
Location: Adelaide CBD, SA

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#76 Post by Patrick_27 » Mon Aug 01, 2016 10:34 pm

Ben wrote:I thought the hospital was having basement car parking? If it's not this will go up a lot quicker.
Not sure about a carpark, but there will definitely be a basement. On the part of the site that they're drilling in the pictures above. Any idea where the loading doc for the hospital will be?

mgb
High Rise Poster!
Posts: 181
Joined: Sat Mar 15, 2008 12:52 pm

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#77 Post by mgb » Mon Aug 01, 2016 11:00 pm

From the plans there was three levels of underground carpark, so going to be a lot of soil removed. Not sure why they have levelled the block - maybe some part of the process to determine final levels for installing parameter piling?

Entrance to carpark will be from the old Bath Lane entrance. Loading dock entrance was up on the western side next to the SAPOL building

how good is he
Legendary Member!
Posts: 1233
Joined: Thu Jan 24, 2013 1:26 am

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#78 Post by how good is he » Tue Aug 02, 2016 12:43 am

Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.

Patrick_27
Super Size Scraper Poster!
Posts: 2436
Joined: Tue Mar 05, 2013 4:41 pm
Location: Adelaide CBD, SA

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#79 Post by Patrick_27 » Tue Aug 02, 2016 2:17 pm

how good is he wrote:Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
Sounds about right, they are currently installing meshing for the concrete pylons on the eastern end of the block. They looked deep...

User avatar
Algernon
Super Size Scraper Poster!
Posts: 1557
Joined: Sat Jul 09, 2005 9:46 pm
Location: Moravia

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#80 Post by Algernon » Sun Aug 07, 2016 8:01 am

how good is he wrote:Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
car park opposite to what exactly?

User avatar
Norman
Donating Member
Donating Member
Posts: 6393
Joined: Sun Mar 25, 2007 1:06 pm

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#81 Post by Norman » Sun Aug 07, 2016 1:08 pm

Algernon wrote:
how good is he wrote:Yes it will have 200 staff carpark (Av. 600 staff over 3 shifts) in the 3 levels of basement car park.
They are also building a 7 storey, 315 public carpark opposite. The top 8th floor will be offices and likely to be the developers C&G new HQ.
car park opposite to what exactly?
Opposite the hospital, on the other side of Angas Street.

EBG
Super Size Scraper Poster!
Posts: 2961
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#82 Post by EBG » Sun Aug 14, 2016 10:50 pm

A picture of the piling rig (14 Aug 16) . It is nearly 4 stories high compared to the 2 story building on the right hand side. They have bored a series of piles along the fence fronting onto Pulteny St. Sorry about the picture quality (too late in the day)
Attachments
20160814_calvery 2.jpg
20160814_calvery 2.jpg (161 KiB) Viewed 4414 times
20160814_calvery.jpg
20160814_calvery.jpg (137.8 KiB) Viewed 4414 times

Patrick_27
Super Size Scraper Poster!
Posts: 2436
Joined: Tue Mar 05, 2013 4:41 pm
Location: Adelaide CBD, SA

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#83 Post by Patrick_27 » Wed Aug 17, 2016 3:38 pm

Didn't have a chance to grab any pictures (wasn't really that exciting anyway), but they've levelled parking lot on the other side of Angus Street ready for the multi-level replacement.

EBG
Super Size Scraper Poster!
Posts: 2961
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#84 Post by EBG » Sat Aug 20, 2016 9:57 pm

Here is a picture of the car park site mentioned by Patrick_27 . It is just behind the on the run service station on Angus St. There are several work sheds on the footpath and the existing bitumen serface has been cleared so it looks like serious work is about to start.
Attachments
20160820_calv 1.jpg
20160820_calv 1.jpg (375.47 KiB) Viewed 4051 times

Dvious
Legendary Member!
Posts: 612
Joined: Wed Aug 17, 2011 11:46 pm

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#85 Post by Dvious » Sun Aug 21, 2016 12:36 pm

I wonder if this site will also have a crane, i would assume so at 8 levels?

EBG
Super Size Scraper Poster!
Posts: 2961
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#86 Post by EBG » Sun Sep 25, 2016 11:24 pm

Piling was taking place along the edge of Angas St on Saturday 24/9/16.
Attachments
20160922_pulteny st.jpg
20160922_pulteny st.jpg (210.98 KiB) Viewed 3602 times

EBG
Super Size Scraper Poster!
Posts: 2961
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#87 Post by EBG » Thu Oct 06, 2016 11:21 pm

Yes there is a basement, they are excavating on the north (western) side.
Attachments
20161004_ calv 2.jpg
20161004_ calv 2.jpg (382.37 KiB) Viewed 3336 times

User avatar
monotonehell
VIP Member
VIP Member
Posts: 5466
Joined: Fri Feb 01, 2008 12:10 am
Location: Adelaide, East End.
Contact:

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#88 Post by monotonehell » Fri Oct 07, 2016 10:54 pm

EBG wrote:Yes there is a swimming pool, they are excavating on the north (western) side.
Fixed it for you.
Exit on the right in the direction of travel.

EBG
Super Size Scraper Poster!
Posts: 2961
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#89 Post by EBG » Sun Oct 16, 2016 9:41 pm

A partial basement with sloping floor has been dug over the southern part of the car park site opposite the hospital site. Meanwhile the hospital basement swimming pool is filling quite well thanks to the recent rain. Picture from Princess Street 16 Oct 16.
Attachments
20161016_angas st car park.jpg
20161016_angas st car park.jpg (456.24 KiB) Viewed 2947 times

EBG
Super Size Scraper Poster!
Posts: 2961
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: New Calvary Hospital | 60m | 12 lvls | Cnr Angas/Pultene

#90 Post by EBG » Mon Oct 31, 2016 11:01 pm

Update as at 30 Oct 16. A lot of work has been done on digging out the basement. Picture looking north west to rear of fire station.
Attachments
20161030_calvery 1.jpg
20161030_calvery 1.jpg (396.72 KiB) Viewed 2677 times