[APP] Re: SAHMRI Stage 2

#61 Post by Prodical » Tue Jan 01, 2019 10:46 pm

I am assuming this is the replacement control building - on the northern side of the rails
Attachments
SAMRI 2.JPG
SAMRI 2.JPG (2.68 MiB) Viewed 967 times

SBD
Legendary Member!
Posts: 772
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview
Has thanked: 228 times
Been thanked: 64 times

[APP] Re: SAHMRI Stage 2

#62 Post by SBD » Tue Jan 01, 2019 11:21 pm

Prodical wrote:
Tue Jan 01, 2019 10:46 pm
I am assuming this is the replacement control building - on the northern side of the rails
The replacement is at Dry Creek.

http://www.sensational-adelaide.com/for ... 20#p169545 says the building on the north side of the Adelaide Yard is power supply and some safety critical local equipment.

Smithy85
High Rise Poster!
Posts: 217
Joined: Mon Jan 26, 2015 11:31 am
Has thanked: 21 times
Been thanked: 8 times

[APP] Re: SAHMRI Stage 2

#63 Post by Smithy85 » Tue Feb 05, 2019 6:11 pm

Chicken tenders being called in the paper today.
Built and Hansen Yuncken advertising.