[COM] Re: Torrens Junction Underpass

#106 Post by ChillyPhilly » Sat Apr 15, 2017 6:56 pm

It sure is.

On Cavan Road in Dry Creek there's a bunch of beams in storage.
Our state, our city, our future.

All views expressed on this forum are my own.

User avatar
Nathan
Super Size Scraper Poster!
Posts: 3770
Joined: Tue Feb 03, 2009 1:09 pm
Location: Bowden
Contact:

[COM] Re: Torrens Junction Underpass

#107 Post by Nathan » Sat Apr 15, 2017 9:16 pm

There is a lot of activity going on at the moment, all the way through to East St. They're really pulling out all stops to get as much as possible done over the long weekend.

EBG
Super Size Scraper Poster!
Posts: 2961
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: Torrens Junction Underpass

#108 Post by EBG » Sat Apr 15, 2017 10:56 pm

A couple of pictures from Saturday 15 /4/2017.(1) on War Memorial Drive there were 2 piling rigs, 2 mobile cranes and at least 3 excavators. (2) near Drayton St Bowden reinforcement cages for piles stacked up waiting to be trucked to work site. The Bowden station is the brownish building mid centre towards right side of picture.
Park Tce was reduced to one lane each way using the western (Bowden) side of the road only.
Attachments
20170415_wmdr.jpg
20170415_wmdr.jpg (357.92 KiB) Viewed 3139 times
20170415_bowden.jpg
20170415_bowden.jpg (377.69 KiB) Viewed 3139 times

I Follow PAFC
High Rise Poster!
Posts: 421
Joined: Tue Jul 08, 2014 7:23 pm

[COM] Re: Torrens Junction Underpass

#109 Post by I Follow PAFC » Sun Apr 16, 2017 12:00 am

From http://www.dpti.sa.gov.au/torrens-rail-junction

To allow construction of the lowered rail line under Park Terrace at Bowden, speed and lane restrictions will be in place on Park Terrace from Good Friday 14 April to Wednesday 26 April 2017.  Click http://www.dpti.sa.gov.au/__data/assets ... l_2017.pdf for  more information.
Attachments
tj.jpg
tj.jpg (203.2 KiB) Viewed 3077 times
I Follow The Port Adelaide Football Club
https://www.facebook.com/IFollowThePAFC/

User avatar
drsmith
Legendary Member!
Posts: 513
Joined: Wed Nov 07, 2007 3:35 pm
Location: Perth

[COM] Re: Torrens Junction Underpass

#110 Post by drsmith » Sun Apr 16, 2017 10:30 am

The following has further detail on the bridge structures being built over the above period.

http://www.dpti.sa.gov.au/__data/assets ... l_2017.pdf

User avatar
Norman
Donating Member
Donating Member
Posts: 6393
Joined: Sun Mar 25, 2007 1:06 pm

[COM] Re: Torrens Junction Underpass

#111 Post by Norman » Mon Apr 17, 2017 1:00 pm

Photo from Stephen Mullighan's twitter.

Image

User avatar
drsmith
Legendary Member!
Posts: 513
Joined: Wed Nov 07, 2007 3:35 pm
Location: Perth

[COM] Re: Torrens Junction Underpass

#112 Post by drsmith » Mon Apr 17, 2017 1:18 pm

I Follow PAFC wrote:From http://www.dpti.sa.gov.au/torrens-rail-junction

To allow construction of the lowered rail line under Park Terrace at Bowden, speed and lane restrictions will be in place on Park Terrace from Good Friday 14 April to Wednesday 26 April 2017. Click http://www.dpti.sa.gov.au/__data/assets ... l_2017.pdf for more information.
If they build half the bridge for Park Terrace over the 4 days of the Easter weekend and have it open to traffic tomorrow, it will be quiet an achievement.

PD2/20
High Rise Poster!
Posts: 364
Joined: Sun Feb 23, 2014 2:32 pm

[COM] Re: Torrens Junction Underpass

#113 Post by PD2/20 » Tue Apr 18, 2017 9:53 pm

drsmith wrote: If they build half the bridge for Park Terrace over the 4 days of the Easter weekend and have it open to traffic tomorrow, it will be quiet an achievement.
A major part of the preparatory work over the past few weeks has been the sinking of the reinforced concrete piles with two parallel rows on the north side of the rail crossing and one to the south side. On Saturday and Sunday bearer beams were installed on the outer north and the south piles. Yesterday the bridge deck was constructed by laying concrete beams on the bearers. By teatime today sand had been laid atop the bridge deck to receive the track formation and bitumen to restore the eastern half of the level crossing. From the DPTI animation it appears that the inner set of piles will form the foundation of the retaining wall for the cycle/walkway underpass on the north side of the lowered railway. These piles which are visible in Stephen Mullighan's photo were cut down to allow the bridge deck to be installed.

The track has been removed through the present Bowden station to allow piling for the retaining wall for the trench adjacent to the face of the Port bound platform. Piling for the Gibson St bridge is also under way.

how good is he
Legendary Member!
Posts: 1233
Joined: Thu Jan 24, 2013 1:26 am

[COM] Re: Torrens Junction Underpass

#114 Post by how good is he » Tue Apr 18, 2017 10:31 pm

So will the concrete walls be poured in-situ & then the tunnel/soil dug out or will the tunnel/soil be dug out first and then precast walls erected?

PD2/20
High Rise Poster!
Posts: 364
Joined: Sun Feb 23, 2014 2:32 pm

[COM] Re: Torrens Junction Underpass

#115 Post by PD2/20 » Wed Apr 19, 2017 8:34 pm

Late morning today traffic was switched to the eastern half of the Park Tce Level Crossing and work started on the western side.

At Torrens Junction piling has been completed for the time being and the Gawler rail track was being reinstated this afternoon.

I Follow PAFC
High Rise Poster!
Posts: 421
Joined: Tue Jul 08, 2014 7:23 pm

[COM] Re: Torrens Junction Underpass

#116 Post by I Follow PAFC » Tue Apr 25, 2017 8:09 pm

Traffic chaos to ease at Bowden.
After months of disruption at a major western intersection, peak hour commuters will have a temporary reprieve from the traffic chaos.

https://au.news.yahoo.com/video/watch/3 ... australia/
I Follow The Port Adelaide Football Club
https://www.facebook.com/IFollowThePAFC/

bits
Legendary Member!
Posts: 820
Joined: Sun Oct 26, 2014 9:24 pm

[COM] Re: Torrens Junction Underpass

#117 Post by bits » Tue Apr 25, 2017 8:16 pm

All I get is the same text, 1 second of video then a blank screen saying sponsor message 0:00/0:00.

What a waste of time.

I Follow PAFC
High Rise Poster!
Posts: 421
Joined: Tue Jul 08, 2014 7:23 pm

[COM] Re: Torrens Junction Underpass

#118 Post by I Follow PAFC » Tue Apr 25, 2017 8:33 pm

bits wrote:All I get is the same text, 1 second of video then a blank screen saying sponsor message 0:00/0:00.

What a waste of time.
Not sure why but it works ok for me. I have try it in Chrome & Firefox.
https://twitter.com/7NewsAdelaide/statu ... 7300012033

Will be closed in October for 3 weeks.
I Follow The Port Adelaide Football Club
https://www.facebook.com/IFollowThePAFC/

bits
Legendary Member!
Posts: 820
Joined: Sun Oct 26, 2014 9:24 pm

[COM] Re: Torrens Junction Underpass

#119 Post by bits » Tue Apr 25, 2017 9:15 pm

I Follow PAFC wrote: Not sure why but it works ok for me. I have try it in Chrome & Firefox.
https://twitter.com/7NewsAdelaide/statu ... 7300012033
That link works perfect.

The first link works on my Windows desktop with Firefox(and I am sure everything else), but fails with Chrome on Android 7.1.1.
The video starts to play correctly then appears to try to load an advert and fails. Firefox on Desktop has an adblocker so no advert is attempted.
My Android device runs no ad blockers. It would if Xposed for Nougat existed ;)

EBG
Super Size Scraper Poster!
Posts: 2961
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: Torrens Junction Underpass

#120 Post by EBG » Tue Apr 25, 2017 10:21 pm

Pictures from 24/4/17. As reported in tonight's TV news the rail tracks have been replaced and trains are running again. Yesterday most lanes on Park Tce were open for use. The only sign of the bridge decking is on the park land side by the pedestrian path. Where the port line crosses the freight line by Memorial drive one can just make out the line of the piers shown by the half loops of reinforcement between the tracks.
Also a large concrete sludge tank is being installed as part of a drainage project in the parklands close to the train bridge over the river Torrens.
Attachments
20170424_torrens 2.jpg
20170424_torrens 2.jpg (256.96 KiB) Viewed 2372 times
20170424_torrens 3.jpg
20170424_torrens 3.jpg (301.13 KiB) Viewed 2372 times
20170424_torrens 1.jpg
20170424_torrens 1.jpg (391.21 KiB) Viewed 2372 times