[U/C] Re: News & Discussion: South Road / North-South Corridor

#2551 Post by ChillyPhilly » Wed Feb 28, 2018 11:32 am

Here they are rotated and cropped.

Image

Image

Image

Image
Our state, our city, our future.

All views expressed on this forum are my own.

User avatar
Kasey771
Legendary Member!
Posts: 603
Joined: Sun Feb 21, 2010 8:56 am

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2552 Post by Kasey771 » Wed Feb 28, 2018 11:35 am

Goodsy wrote:
Tue Feb 27, 2018 11:44 am
alexczarn wrote:
Tue Feb 27, 2018 11:28 am
No left turn from the northbound M2 onto the A9 Pt River Expwy?
I don't think they've highlighted parts of the interchanges that are already built. The Northern Interchange is also missing the left turn onto the NEXY from Port Wakefield Road
If that's true its pretty lazy and could lead to mis-communication with the public which is something youd think they'd be keen to avoid.
Big infrastructure investments are usually under-valued and & over-criticized while in the planning stage. It's much easier to envision the here and now costs and inconveniences, and far more difficult to imagine fully the eventual benefits.

User avatar
rhino
Super Size Scraper Poster!
Posts: 3067
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2553 Post by rhino » Wed Feb 28, 2018 12:22 pm

mawsonguy wrote:
Tue Feb 27, 2018 10:48 pm
Off ramps are designed with curves in order to slow traffic. There is insufficient room between the back fence of the caravan park and the southbound carriageway to accommodate an S bend in the offramp which means it cannot connect with a roundabout on the overpass. Likewise, there is insufficient room between the overpass and the southern boundary of the caravan park to allow the offramp to merge with the eastbound carriageway on the overpass.
Sorry, but ... bollocks.

Take a look at the newest freeway interchange in South Australia, which was built last year - the Nairne exit on the South Eastern Freeway. When exiting from the Murray Bridge direction, the ramp is steep (downhill) and almost straight, with a roundabout at the bottom. When exiting from the Adelaide end the ramp does an almost 180-degree turn, and is very tight. No problems so far, and heaps of use.
cheers,
Rhino

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2588
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2554 Post by ChillyPhilly » Sun Mar 11, 2018 10:34 pm

Work on rebuilding the Pym Street/South Road intersection is well underway.

At the opposite end of the project, work has again picked up on Taylors Bridge (over the Torrens).
Our state, our city, our future.

All views expressed on this forum are my own.

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6040
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2555 Post by rev » Fri Mar 23, 2018 12:42 am

AD9D181B-6457-40BC-AE9C-2E54903ED784.jpeg
AD9D181B-6457-40BC-AE9C-2E54903ED784.jpeg (266.47 KiB) Viewed 4936 times
Port Road intersection same on both ends of the bridge.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2588
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2556 Post by ChillyPhilly » Mon Mar 26, 2018 12:34 pm

Torrens to Torrens Updates

- March 2018 Construction Newsletter http://www.t2talliance.com.au/wp88/wp-c ... h-2018.pdf

From the final page:

'A Community Information Drop In Day and sausage sizzle will be held on Saturday 14 April from 11am to 2pm at the T2T Alliance Project site office on Ridley Street, Hindmarsh. (Please note that there is limited parking available on Ridley Street).

Come along anytime between 11am and 2pm to meet members of the team and find out more about:
• works in progress, including the lowered motorway construction
• remaining works, including landscaping.

Team members will be available to answer questions about the project and there will be an opportunity to view video footage of the lowered motorway works in progress, as well as photos of key construction activities.'

- March 2018 Pym Street intersection update, featuring final layout design (rudimentary, but it's intended to just show the traffic movements): http://www.t2talliance.com.au/wp88/wp-c ... h-2017.pdf
Our state, our city, our future.

All views expressed on this forum are my own.

User avatar
Kasey771
Legendary Member!
Posts: 603
Joined: Sun Feb 21, 2010 8:56 am

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2557 Post by Kasey771 » Wed Mar 28, 2018 11:54 am

regarding the works around the Northern Connector Southern interchange on PREXY.. heading west from South Road, the median Strip has been excavated down about half a metre.. does anyone have an idea why?

Is it for lighting around the future I/C?
Big infrastructure investments are usually under-valued and & over-criticized while in the planning stage. It's much easier to envision the here and now costs and inconveniences, and far more difficult to imagine fully the eventual benefits.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2588
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2558 Post by ChillyPhilly » Wed Mar 28, 2018 11:59 am

Kasey771 wrote:
Wed Mar 28, 2018 11:54 am
regarding the works around the Northern Connector Southern interchange on PREXY.. heading west from South Road, the median Strip has been excavated down about half a metre.. does anyone have an idea why?

Is it for lighting around the future I/C?
Not sure about the depth, but removing electrical cabling could be why. That stretch of PRExy will be widened to accommodate the interchange and its new lanes and ramps.
Our state, our city, our future.

All views expressed on this forum are my own.

User avatar
Norman
Donating Member
Donating Member
Posts: 6393
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2559 Post by Norman » Wed Mar 28, 2018 9:12 pm

The Darlington Project team have also released a newsletter: https://www.infrastructure.sa.gov.au/__ ... web_v2.pdf

Here are the upcoming milestones:

1st quarter of 2018
Ayliffes Road traffic switch
Installation of concrete beams for the Flinders Drive bridge
Concrete pours for Flinders Drive bridge deck
Excavation for bridge enabling works

2nd quarter of 2018
Installation of concrete beams for the Sturt Road bridge
Excavation works
Main South Road bridge over the Southern Expressway to surface roads open to traffic
Installation of Main South Road bridge over the Southern Expressway to the lowered motorway
South Road Traffic switch (between Ayliffes Road and Tonsley Boulevard)
Traffic switch between Southern Expressway and Flinders Drive

3rd quarter of 2018
Flinders Drive Extension (new road between Sturt Road and Flinders Drive) open to traffic
Excavation works
Birch Crescent/Sturt Road signalised intersection completed and operational
Installation of Ayliffes Road bridge
Traffic switch between Southern Expressway and Flinders Drive
Completion of Flinders Drive bridge

4th quarter of 2018
Installation of concrete beams for the Tonsley Boulevard bridge
Excavation works
Completion of Sturt Road bridge
Completion of Sutton Road/Mimosa Drive bridge

aceman
High Rise Poster!
Posts: 297
Joined: Sat Mar 11, 2006 1:02 am
Location: Adelaide (Hallett Cove)

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2560 Post by aceman » Sat Mar 31, 2018 9:15 pm

does anyone know what's happening with the section of south road between Pym street and the start of the superway after recency road? the T2T finishes at Pym street then a km or so down the road the superway starts. are there any plans for this section in between?

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2588
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2561 Post by ChillyPhilly » Sat Mar 31, 2018 9:19 pm

aceman wrote:does anyone know what's happening with the section of south road between Pym street and the start of the superway after recency road? the T2T finishes at Pym street then a km or so down the road the superway starts. are there any plans for this section in between?
That section is a separate project. We'll have to wait and see what happens.
Our state, our city, our future.

All views expressed on this forum are my own.

aceman
High Rise Poster!
Posts: 297
Joined: Sat Mar 11, 2006 1:02 am
Location: Adelaide (Hallett Cove)

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2562 Post by aceman » Sat Mar 31, 2018 9:33 pm

ok thanks, I've noticed that if the T2T was to continue further north towards recency rd there are a few large showrooms etc near the intersection of recency rd. further south there's mainly houses and u can see where the land acquisition suddenly stopped!!

User avatar
Norman
Donating Member
Donating Member
Posts: 6393
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2563 Post by Norman » Sat Mar 31, 2018 9:50 pm

aceman wrote:
Sat Mar 31, 2018 9:15 pm
does anyone know what's happening with the section of south road between Pym street and the start of the superway after recency road? the T2T finishes at Pym street then a km or so down the road the superway starts. are there any plans for this section in between?
Money from the state government has been allocated in last year's budget, so hopefully there will be some federal funding for this in the next federal budget.

Waewick
Super Size Scraper Poster!
Posts: 3620
Joined: Tue Jun 10, 2008 1:39 pm

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2564 Post by Waewick » Mon Apr 02, 2018 6:54 pm

Norman wrote:
aceman wrote:
Sat Mar 31, 2018 9:15 pm
does anyone know what's happening with the section of south road between Pym street and the start of the superway after recency road? the T2T finishes at Pym street then a km or so down the road the superway starts. are there any plans for this section in between?
Money from the state government has been allocated in last year's budget, so hopefully there will be some federal funding for this in the next federal budget.
Given the latest 2PP at federal level I'm confident that we will get funding

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6040
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: News & Discussion: South Road / North-South Corridor

#2565 Post by rev » Tue Apr 03, 2018 2:55 pm

Waewick wrote:
Mon Apr 02, 2018 6:54 pm
Norman wrote:
aceman wrote:
Sat Mar 31, 2018 9:15 pm
does anyone know what's happening with the section of south road between Pym street and the start of the superway after recency road? the T2T finishes at Pym street then a km or so down the road the superway starts. are there any plans for this section in between?
Money from the state government has been allocated in last year's budget, so hopefully there will be some federal funding for this in the next federal budget.
Given the latest 2PP at federal level I'm confident that we will get funding
Well the Liberals(state) are also committed to the north south corridor, so they say. It was an election year..
Hopefully we can get a 'rolling' works program for the remainder of the corridor now. Once work finishes on one section, the next section is ready to go and they move on to that without too much delay.