[U/C] M2 North-South Motorway

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
Brucetiki
Legendary Member!
Posts: 985
Joined: Tue Apr 17, 2012 6:20 pm

[U/C] Re: North-South Motorway

#2851 Post by Brucetiki » Tue Jun 19, 2018 1:09 pm

Noticed they were testing one of the display screens heading into the trench this morning just past Pym St. This is in addition to many of the speed limit signs flashing at 10 km/h for the workmen.

Looks like they're making good progress surfacing the road too. Reckon we're still good for a September opening?

mawsonguy
High Rise Poster!
Posts: 196
Joined: Fri Dec 20, 2013 8:11 am

[U/C] Re: North-South Motorway

#2852 Post by mawsonguy » Sun Jun 24, 2018 8:58 am

Photo of the Sutton Road bridge at Darlington which was posted on the DPTI Facebook page. It shows the excavation of the trench. Still a long way to go.

Image

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2582
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: North-South Motorway

#2853 Post by ChillyPhilly » Mon Jul 02, 2018 5:54 pm

These went up on DPTI's LinkedIn page.

Image

Image

Image
Our state, our city, our future.

All views expressed on this forum are my own.

SBD
Super Size Scraper Poster!
Posts: 2519
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview

[U/C] Re: North-South Motorway

#2854 Post by SBD » Mon Jul 02, 2018 9:12 pm

What are they doing with the dirt they dig out of the trench? Is it getting taken all the way to the Northern Connector, or is there somewhere closer to take it?

kenget
Gold-Member ;)
Posts: 88
Joined: Wed Dec 19, 2007 4:33 pm

[U/C] Re: North-South Motorway

#2855 Post by kenget » Tue Jul 03, 2018 1:35 pm

A new video update of the Darlington project has been posted by the DPTI on its youtube channel:



https://youtu.be/Q4I4scWBSAk

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2582
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: North-South Motorway

#2856 Post by ChillyPhilly » Sat Jul 07, 2018 1:00 pm

Good progress has been made with T2T the past week or so.

Firstly, the widening of Taylors Bridge (the one over the Torrens) looks to be almost complete.

Throughout the rest of the project, finishing touches for concrete components are being done (e.g. the concrete on the South Road surface acting as a buffer between traffic and the wall of the trench). Lighting has been installed, along with traffic management cameras.

I dare say we could expect it to be traffic ready in about a month.
Our state, our city, our future.

All views expressed on this forum are my own.

Listy
High Rise Poster!
Posts: 186
Joined: Sat Oct 01, 2016 11:07 pm

[U/C] Re: North-South Motorway

#2857 Post by Listy » Mon Jul 09, 2018 9:13 pm

ChillyPhilly wrote:
Sat Jul 07, 2018 1:00 pm
Good progress has been made with T2T the past week or so.

Firstly, the widening of Taylors Bridge (the one over the Torrens) looks to be almost complete.

Throughout the rest of the project, finishing touches for concrete components are being done (e.g. the concrete on the South Road surface acting as a buffer between traffic and the wall of the trench). Lighting has been installed, along with traffic management cameras.

I dare say we could expect it to be traffic ready in about a month.
It took a nearly a year longer than expected, but the newly widened side of Taylor Bridge was open to traffic tonight. However the eastern side is now closed (for resurfacing? so probably not for long). When I drove past there seemed to be excavation & leveling work going on over the weekend at the northern end of the T2T - that part still looks more than a month away from finishing to me?

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2582
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: North-South Motorway

#2858 Post by ChillyPhilly » Tue Jul 10, 2018 10:52 pm

Excavation is a pretty quick process, but what takes longer is the service relocation. Most of this is done at the northern end, so it's a matter of tidying it up and finishing it off. Then in comes the final layer of asphalt in September, followed by landscaping and other urban treatments by the end of the year.
Our state, our city, our future.

All views expressed on this forum are my own.

kenget
Gold-Member ;)
Posts: 88
Joined: Wed Dec 19, 2007 4:33 pm

[U/C] Re: North-South Motorway

#2859 Post by kenget » Wed Jul 11, 2018 2:07 pm

The July construction update has been posted on the DPTI website for the Darlington Upgrade...

Website:
https://www.infrastructure.sa.gov.au/ns ... blications

Direct link to the update:
https://www.infrastructure.sa.gov.au/__ ... er_web.pdf

Some pretty good information about how the bridges are being constructed and the upcoming traffic diversions. Would've been awesome if they had some dates for these milestones though.

Mr Messy
Gold-Member ;)
Posts: 91
Joined: Wed Mar 23, 2016 8:55 pm

[U/C] Re: North-South Motorway

#2860 Post by Mr Messy » Wed Jul 11, 2018 2:25 pm

The next traffic switch letter was sent out by email yesterday, but I haven't seen it on the website yet.

The weekend of July 28 will see traffic over the first expressway bridge

Vasco
High Rise Poster!
Posts: 129
Joined: Wed Jul 11, 2018 9:02 pm

[U/C] Re: North-South Motorway

#2861 Post by Vasco » Wed Jul 11, 2018 9:10 pm

The Northbound onramp over the current expressway main entry (opposite McDonalds) is really taking shape.

Also anyone know what this building will be used for? Situated between FMC - McDonalds on that side. Image


Sent from my iPhone using Tapatalk

User avatar
Norman
Donating Member
Donating Member
Posts: 6391
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: [U/C] Re: North-South Motorway

#2862 Post by Norman » Thu Jul 12, 2018 7:28 am

Vasco wrote:The Northbound onramp over the current expressway main entry (opposite McDonalds) is really taking shape.

Also anyone know what this building will be used for? Situated between FMC - McDonalds on that side. Image


Sent from my iPhone using Tapatalk
It will house ITS equipment and management for the project.

Mr Messy
Gold-Member ;)
Posts: 91
Joined: Wed Mar 23, 2016 8:55 pm

[U/C] Re: North-South Motorway

#2863 Post by Mr Messy » Thu Jul 12, 2018 1:41 pm

Darlington traffic switch document:
https://www.infrastructure.sa.gov.au/__ ... flyer_.pdf

EBG
Super Size Scraper Poster!
Posts: 2947
Joined: Fri Jul 12, 2013 10:49 pm

[U/C] Re: North-South Motorway

#2864 Post by EBG » Sat Jul 14, 2018 2:31 pm

Looking north (towards Pym St) from Torrens Rd over pass. Roadway has no bitumen at this time and side walls are not clad yet.
Attachments
20180714_south rd 1.jpg
20180714_south rd 1.jpg (408.62 KiB) Viewed 4158 times

EBG
Super Size Scraper Poster!
Posts: 2947
Joined: Fri Jul 12, 2013 10:49 pm

[U/C] Re: North-South Motorway

#2865 Post by EBG » Sat Jul 14, 2018 2:34 pm

Looking south from Torrens Rd over pass . Bitumen stops just next to over pass.
Attachments
20180714_south rd 2.jpg
20180714_south rd 2.jpg (310.08 KiB) Viewed 4157 times

Post Reply

Who is online

Users browsing this forum: Google [Bot], Semrush [Bot], Spotto and 20 guests