[U/C] M2 North-South Motorway

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
User avatar
1NEEDS2POST
High Rise Poster!
Posts: 471
Joined: Tue Jun 26, 2018 5:01 pm

[U/C] Re: M2 North-South Motorway

#4846 Post by 1NEEDS2POST » Fri Sep 18, 2020 7:08 pm

Cross streets don't need motorway access if we have a tunnel. All that needs to happen is the occasional connection between the surface st South Rd and the motorway.
AG wrote:
Wed Sep 16, 2020 10:08 am
I can't remember where I saw this, but I have seen some unique grade separation projects which involve putting traffic in one direction through a cut and cover tunnel, and then putting traffic in the opposite direction on an overpass which sits directly on top of and is supported by the tunnel structure, with the ramps to ground level at each end staggered to save ground level space.
We could just have a double decker cut and cover tunnel beneath the existing South Rd. It would easily fit in that land area. The tunnel may have to have bends to fit the staggered ramps.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2584
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: M2 North-South Motorway

#4847 Post by ChillyPhilly » Sat Sep 19, 2020 7:48 am

Excuse the rushed photo, but the first beams are being assembled at R2P.

Image
Our state, our city, our future.

All views expressed on this forum are my own.

aceman
High Rise Poster!
Posts: 297
Joined: Sat Mar 11, 2006 1:02 am
Location: Adelaide (Hallett Cove)

[U/C] Re: M2 North-South Motorway

#4848 Post by aceman » Sun Sep 20, 2020 7:38 pm

is there more layers of bitumen to go down in the trench at Darlington? when you enter the trench at the northern end when travelling south the surface has been scraped and there are large raised sections around the man hole covers of the inspection ports. doesn't look finished at all

NYG
Sen-Rookie-Sational
Posts: 27
Joined: Sat Sep 08, 2018 5:23 pm

[U/C] Re: M2 North-South Motorway

#4849 Post by NYG » Sun Sep 20, 2020 7:56 pm

aceman wrote:is there more layers of bitumen to go down in the trench at Darlington? when you enter the trench at the northern end when travelling south the surface has been scraped and there are large raised sections around the man hole covers of the inspection ports. doesn't look finished at all
Can’t remember where but recently read that lowered motorway is getting final surfacing done towards the end of the year.

User avatar
Spotto
Legendary Member!
Posts: 693
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: M2 North-South Motorway

#4850 Post by Spotto » Sun Sep 20, 2020 9:41 pm

NYG wrote:
Sun Sep 20, 2020 7:56 pm
aceman wrote:is there more layers of bitumen to go down in the trench at Darlington? when you enter the trench at the northern end when travelling south the surface has been scraped and there are large raised sections around the man hole covers of the inspection ports. doesn't look finished at all
Can’t remember where but recently read that lowered motorway is getting final surfacing done towards the end of the year.
The trench was fully opened on August 1st, I'd love to know what's taking them so long to do final surfacing.

Hopefully they'll also resurface other parts of South Road, the Daws Road to Darlington section in particular is absolutely terrible. T2D is not due to start construction for another four years, the current surfacing on South Road will not last that long.

User avatar
rogue
Donating Member
Donating Member
Posts: 651
Joined: Tue Sep 05, 2006 8:45 am
Location: Over here

[U/C] Re: M2 North-South Motorway

#4851 Post by rogue » Mon Sep 21, 2020 6:21 am

The final layer will be SMA type asphalt and requires warmer temperatures to place.
Expect some action on this next month.

Bacon
High Rise Poster!
Posts: 117
Joined: Tue Oct 15, 2013 1:17 pm

[U/C] Re: M2 North-South Motorway

#4852 Post by Bacon » Thu Sep 24, 2020 5:02 pm

Can anyone explain the reasoning behind this?
0E9D24FD-F3EA-4281-9DB5-3858526C4746.jpeg

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6030
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: M2 North-South Motorway

#4853 Post by rev » Thu Sep 24, 2020 5:46 pm

Bacon wrote:
Thu Sep 24, 2020 5:02 pm
Can anyone explain the reasoning behind this?
0E9D24FD-F3EA-4281-9DB5-3858526C4746.jpeg
did you get permission to take that photo? :lol:

Probably just for within the work site it self, might be safety related.
They cant stop you taking a photo or video from the road or footpaths.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2584
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: M2 North-South Motorway

#4854 Post by ChillyPhilly » Thu Sep 24, 2020 5:50 pm

I'm gonna guess it's because they have a contracted drone operator filming the project.
Our state, our city, our future.

All views expressed on this forum are my own.

User avatar
Norman
Donating Member
Donating Member
Posts: 6392
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: M2 North-South Motorway

#4855 Post by Norman » Thu Sep 24, 2020 10:43 pm

The workers probably don't want to get photographed, which is fair enough...

User avatar
SouthAussie94
Legendary Member!
Posts: 506
Joined: Tue Mar 27, 2012 10:03 pm
Location: Southern Suburbs

[U/C] Re: M2 North-South Motorway

#4856 Post by SouthAussie94 » Fri Sep 25, 2020 11:17 am

It's quite common on construction sites for photography to be forbidden. If for example hardhats are mandatory, yet I take a photo and someone isn't wearing one, and then something happens, it's possible my photo could be used as evidence for any potential follow up. Easier to have a blanket ban than to police the content of photos taken on site.
"All we are is bags of bones pushing against a self imposed tide. Just be content with staying alive"

Views and opinions expressed are my own and don't necessarily reflect the views or opinions of any organisation of which I have an affiliation

User avatar
Norman
Donating Member
Donating Member
Posts: 6392
Joined: Sun Mar 25, 2007 1:06 pm

[U/C] Re: M2 North-South Motorway

#4857 Post by Norman » Sun Sep 27, 2020 8:07 am

The new drive-through video of the Regency to Pym project is up now. As always, feedback is welcome!

https://youtu.be/TcyIHxtngB4

Furyan
Gold-Member ;)
Posts: 74
Joined: Wed May 09, 2018 2:18 pm

[U/C] Re: M2 North-South Motorway

#4858 Post by Furyan » Sun Sep 27, 2020 4:31 pm

ChillyPhilly wrote:
Thu Sep 24, 2020 5:50 pm
I'm gonna guess it's because they have a contracted drone operator filming the project.
More regular drone flights would be something people would be interested in.

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6030
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: M2 North-South Motorway

#4859 Post by rev » Sun Sep 27, 2020 7:42 pm

Norman wrote:
Sun Sep 27, 2020 8:07 am
The new drive-through video of the Regency to Pym project is up now. As always, feedback is welcome!

https://youtu.be/TcyIHxtngB4
Cant remember if I suggested this from one of your previous videos, but perhaps slow the footage down on key areas like the bridge construction.
But other then that :applause:

EBG
Super Size Scraper Poster!
Posts: 2949
Joined: Fri Jul 12, 2013 10:49 pm

[U/C] Re: M2 North-South Motorway

#4860 Post by EBG » Sun Sep 27, 2020 11:53 pm

27/9/2020 Some pictures of the Regency Rd bridge under construction at temporary site. Please click on pictures for bigger.
Attachments
20200927_south rd 2.jpg
20200927_south rd 1.jpg

Post Reply

Who is online

Users browsing this forum: Ahrefs [Bot], Google [Bot] and 19 guests