[COM] Re: Oaklands Crossing | $174m

Posted: Tue Aug 13, 2019 8:04 pm
by AndyWelsh
Jaymz wrote:
SRW wrote:
Tue Aug 13, 2019 5:56 pm
Weird. Time out bench?
Indeed. Surely a candidate for the Shitadelaide FB/Instagram page :?

Haha I actually tried them! They haven’t posted it although I have had some successes in the past, which I’m VERY proud of!


Sent from my iPhone using Tapatalk

[COM] Re: Oaklands Crossing | $174m

Posted: Tue Aug 13, 2019 8:43 pm
by metro
SRW wrote:
Tue Aug 13, 2019 5:56 pm
Weird. Time out bench?
I believe that bench is there as a requirement, a place for the elderly folks to rest while they hike up and down the long ramps to get between the ground and platform levels. :lol:

[COM] Re: Oaklands Crossing | $174m

Posted: Tue Aug 13, 2019 8:46 pm
by SRW
metro wrote:
Tue Aug 13, 2019 8:43 pm
SRW wrote:
Tue Aug 13, 2019 5:56 pm
Weird. Time out bench?
I believe that bench is there as a requirement, a place for the elderly folks to rest while they hike up and down the long ramps to get between the ground and platform levels. :lol:
They didn't have to face it to the wall, as though you're there to think about how naughty you've been :lol:

[COM] Re: Oaklands Crossing | $174m

Posted: Tue Aug 13, 2019 9:16 pm
by Nathan
SRW wrote:
Tue Aug 13, 2019 5:56 pm
Weird. Time out bench?
I think some DPTI planners need to sit on it.

[COM] Re: Oaklands Crossing | $174m

Posted: Wed Aug 21, 2019 8:26 pm
by Norman
I went back tonight to see the completed project. Some small things still to finish but largely this project is done.

Station amenities building, with 2 toilets and a bike locker
Image

Landscaping works
Image

Image

Image

New Advertising board
Image

Image

Image

Image

Image

Interestingly, some of the pre-2008 car parks have not been fixed

Image

New car park in the north-east corner

Image

[COM] Re: Oaklands Crossing | $174m

Posted: Fri Aug 23, 2019 6:45 pm
by SBD
Is the "new advertising board" for advertising, or driver information? It looks the same shape as the ones on the North-South Motorway and Port Wakefield Road with travel times to likely destinations.

[COM] Re: Oaklands Crossing | $174m

Posted: Fri Aug 23, 2019 10:30 pm
by Norman
SBD wrote:
Fri Aug 23, 2019 6:45 pm
Is the "new advertising board" for advertising, or driver information? It looks the same shape as the ones on the North-South Motorway and Port Wakefield Road with travel times to likely destinations.
It's for advertising. It looks exactly like the one at Anzac Highway at Keswick. Traffic information signs usually feature warning lights on the sides of the LED panel if they are at that size, or they come in a smaller size found in different locations around Adelaide.

[COM] Re: Oaklands Crossing | $174m

Posted: Sat Aug 24, 2019 11:31 am
by Mpol03
When more design though has gone into that amenities box than most development in the CBD :secret:

[COM] Re: Oaklands Crossing | $174m

Posted: Sun Sep 01, 2019 4:25 pm
by ChillyPhilly
OK LADS

Image

[COM] Re: Oaklands Crossing | $174m

Posted: Sun Sep 01, 2019 4:49 pm
by EBG
Great pictures Norman. Who is responsible for watering the lawn?
I only hope it still looks this good this time next year.

[COM] Re: Oaklands Crossing | $174m

Posted: Sun Sep 08, 2019 5:45 pm
by rev
EBG wrote:
Sun Sep 01, 2019 4:49 pm
Great pictures Norman. Who is responsible for watering the lawn?
I only hope it still looks this good this time next year.
Surely there's an automated sprinkler system setup for it? If not, wow..

[COM] Re: Oaklands Crossing | $174m

Posted: Sun Sep 08, 2019 11:15 pm
by NTRabbit
rev wrote:
Sun Sep 08, 2019 5:45 pm
EBG wrote:
Sun Sep 01, 2019 4:49 pm
Great pictures Norman. Who is responsible for watering the lawn?
I only hope it still looks this good this time next year.
Surely there's an automated sprinkler system setup for it? If not, wow..
Pretty sure they put those purple pipe irrigation grids under every bit of green on the upgrade

[COM] Re: Oaklands Crossing | $174m

Posted: Mon Jan 20, 2020 10:51 am
by Eurostar
So do the old pedestrian mazes get reused ?

[COM] [COM] Re: [COM] Re: Oaklands Crossing | $174m

Posted: Mon Jan 20, 2020 12:56 pm
by Norman
Eurostar wrote:So do the old pedestrian mazes get reused ?
Which ones? All pedestrian crossings have been grade separated.

[COM] Re: [COM] Re: [COM] Re: Oaklands Crossing | $174m

Posted: Mon Jan 20, 2020 1:24 pm
by Spotto
Norman wrote:
Mon Jan 20, 2020 12:56 pm
Eurostar wrote:So do the old pedestrian mazes get reused ?
Which ones? All pedestrian crossings have been grade separated.
Pretty sure he means has the old active pedestrian crossing equipment been removed and reinstalled at another station instead of throwing it out?