[COM] Torrens Junction Underpass
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2588
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[COM] Re: Torrens Junction Underpass
Does the new station look to have much in the way of comfort for patrons?
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
[COM] Re: Torrens Junction Underpass
Not yet, some seating has been installed but a lot of the shelters are not completed yet. I'd wait a bit to see what else they add.ChillyPhilly wrote: ↑Mon Jan 15, 2018 11:47 amDoes the new station look to have much in the way of comfort for patrons?
- Nathan
- Super Size Scraper Poster!
- Posts: 3770
- Joined: Tue Feb 03, 2009 1:09 pm
- Location: Bowden
- Contact:
[COM] Re: Torrens Junction Underpass
Project Update from Connexion Alliance:
Major construction on the Torrens Rail Junction Project is almost complete. A key milestone has been achieved with the return to service of trains on the Outer Harbor and Grange Line and the opening of platforms to passengers on the new lowered Bowden Railway Station on 15 January 2018. Both the Gawler rail line and the interstate rail freight line are running on their final alignment in the Adelaide Park Lands.
Remaining works will continue during day and intermittent night shifts with landscaping and other finishing activities underway until March.
Finishing activities include resurfacing of roads and footpaths, installation of fencing, landscaping and re-planting in the Park Lands and Bowden and the installation of street furniture.
Construction update and achievements
The lowered Bowden Railway Station is operational, providing access for rail passengers while finishing works continue. These works include installation of paths, passenger information displays and landscaping. Final works on the Station Place, Field Street and Park Lands pedestrian bridges are also underway.
We have now completed the three major road/rail bridges at Gibson Street, Park Terrace and within the Park Lands, with safety fencing and throw screens. The removal of the Park Terrace level crossing has improved traffic flow on Park Terrace, resulting in efficiency improvements across the broader road network.
The ConneXion Alliance team of more than 350 people has worked day and night, clocking up 750,000 work hours to safely deliver the Torrens Rail Junction Project.
Vehicles, pedestrians and cyclists
Completion of our major construction milestones has led to a signficant reduction in the number of trucks using War Memorial Drive, Park Terrace and Port Road. With final works in the Park Lands and at Bowden Railway Station, haulage routes are planned to minimise community impacts. Signage and traffic controllers are in place to advise of changed conditions and we ask that you plan your journey in advance.Noise and vibration management
- Park Terrace resurfacing works will be underway
day and night from mid-January, for around two weeks. These works will require changes to traffic lanes and speed restrictions. Pedestrians will be detoured to Gibson Street to avoid these works and maintain safety, with detour signage and traffic controllers on hand to assist.- Gibson Street will remain temporarily closed to vehicles until further notice. Access for pedestrians and cyclists remains open with a possible short-term closure to complete the final asphalt works. The Park Terrace footpath (Bowden-side) and Gibson Street remain the primary detour routes for pedestrians and cyclists between Bowden Village and Port Road.
- East Street is permanently closed to vehicles, pedestrians and cyclists.
- Drayton Street, between East Street and Third Street, will remain temporarily closed to vehicles,
pedestrians and cyclists until further notice.- War Memorial Drive will continue to be accessed by construction vehicles throughout the day and night whilst works are underway.
- Gaol Road is open to traffic but some truck movements can be expected for access to the rail corridor. Traffic management is in place to ensure safe access for road users, pedestrians and cyclists.
Final construction works will be ongoing over the coming weeks. Whilst some inconvenience may be expected, every effort will be made to minimise disturbance to the local community. Bowden, Hindmarsh and North Adelaide residents and businesses in close proximity to the works may experience noise, light spill and some vibration.
[COM] Re: Torrens Junction Underpass
The Gibson Street bridge is almost finished.
Also, screens are up at Bowden Station
Also, screens are up at Bowden Station
[COM] Re: Torrens Junction Underpass
Here's footage of the trip through the whole trench and the rail overpass.
https://www.youtube.com/watch?v=1dDZO5ducvw
https://www.youtube.com/watch?v=1dDZO5ducvw
[COM] Re: Torrens Junction Underpass
Why is War memorial drive still 40 k/h there was not one worker on site . All they need to do is clean up and move out. Everything the state government does is 95% finished for months.
- Nathan
- Super Size Scraper Poster!
- Posts: 3770
- Joined: Tue Feb 03, 2009 1:09 pm
- Location: Bowden
- Contact:
[COM] Re: Torrens Junction Underpass
There's still work going on alongside the train lines including the active crossings, fencing and site remediation.
[COM] Re: Torrens Junction Underpass
There was one working there yesterday and there is no one working there today even the state government said these type of signs should be taken down when there is no one actually doing any work !
[COM] Re: Torrens Junction Underpass
The new regulations come into force in June 2018. See http://www.abc.net.au/news/2017-12-29/r ... on/9291728. Also note the dual condition for removal of signs.
The plastic barriers abutting on the cycle lane are probably considered a hazard to traffic.Mr Mullighan said speed restrictions would have to be removed when there were no workers present and the road conditions were not a danger.
- Nathan
- Super Size Scraper Poster!
- Posts: 3770
- Joined: Tue Feb 03, 2009 1:09 pm
- Location: Bowden
- Contact:
[COM] Torrens Junction Underpass
I ride home that way every night, and the plastic barriers aren't great, but they're not the worst hazard. All the grit and dirt in the lane is a far bigger issue (I managed to put my fillings to the test once hitting a sizeable rock unsighted), plus people walking in the cycle lane due to the lack of anywhere else to walk (usually walking with traffic, and with headphones on, so they can't see or hear anyone approaching from behind...)
Anyway, looks like Gibson St will be reopening some time this week. A lot of fencing has come down and line marking done. From the looks of things, just a few street lights and some plantings remain before it can reopen for traffic. Some minor works on the outside lanes and gutters for Park Tce this weekend with some lane closures, but looked on track to be done before Tuesday.
- Nathan
- Super Size Scraper Poster!
- Posts: 3770
- Joined: Tue Feb 03, 2009 1:09 pm
- Location: Bowden
- Contact:
[COM] Re: Torrens Junction Underpass
Gibson St has now reopened to all traffic. Work continues on the bike/pedestrian path and bridges.
Not sure why no-one thought it would be a good idea to re-do the road surface and footpaths of the bit of Gibson St between the train line and Port Rd, such a short section and in horrible condition.
Not sure why no-one thought it would be a good idea to re-do the road surface and footpaths of the bit of Gibson St between the train line and Port Rd, such a short section and in horrible condition.
[COM] Re: [U/C] Re: Torrens Junction Underpass
That part would be outside the project scope, and would be council responsibility. Hopefully it will be done soon.Not sure why no-one thought it would be a good idea to re-do the road surface and footpaths of the bit of Gibson St between the train line and Port Rd, such a short section and in horrible condition.
- Nathan
- Super Size Scraper Poster!
- Posts: 3770
- Joined: Tue Feb 03, 2009 1:09 pm
- Location: Bowden
- Contact:
[COM] Re: [U/C] Re: Torrens Junction Underpass
Oh absolutely. Council should have been proactive though and done it while the road was closed. Instead they've been doing random backstreets (like the little dead-end surface level bit of Park Tce at the end of Eighth St).Norman wrote: ↑Fri Mar 16, 2018 11:29 amThat part would be outside the project scope, and would be council responsibility. Hopefully it will be done soon.Not sure why no-one thought it would be a good idea to re-do the road surface and footpaths of the bit of Gibson St between the train line and Port Rd, such a short section and in horrible condition.