[U/C] Re: Port Adelaide Dock Spur Line

#151 Post by Eurostar » Fri Jun 21, 2019 10:38 am

Maybe NRM could merge with Steamranger and setup a museum at Mount Barker :idea:

how good is he
Legendary Member!
Posts: 1233
Joined: Thu Jan 24, 2013 1:26 am

[U/C] Re: Port Adelaide Dock Spur Line

#152 Post by how good is he » Fri Jun 21, 2019 10:38 am

The nitty gritty needs to come out and all has to be fully transparent. If a contract was signed how can this Govt terminate it? Who costed the project at $16m and what has now caused it to blow out 250%? Is the company that was awarded the contract now getting paid out [obviously a reduced amount] for doing nothing?

User avatar
Nathan
Super Size Scraper Poster!
Posts: 3761
Joined: Tue Feb 03, 2009 1:09 pm
Location: Bowden
Contact:

[U/C] Re: Port Adelaide Dock Spur Line

#153 Post by Nathan » Fri Jun 21, 2019 11:55 am

Something definitely stinks. The railway museum had their connection to the line cut less than two weeks ago, and concrete sleepers for the spur are already lined up ready to be installed. This wasn't a project still in planning.

Image

Image

User avatar
Nathan
Super Size Scraper Poster!
Posts: 3761
Joined: Tue Feb 03, 2009 1:09 pm
Location: Bowden
Contact:

[U/C] Re: Port Adelaide Dock Spur Line

#154 Post by Nathan » Fri Jun 21, 2019 12:08 pm

LOL, and now Knoll is claiming they're not for the Port Dock project, but for Rail Revitalisation and projects like the Brighton Rd and Torrens Rd level crossings. That's why they're all lined up next to the Port Dock project. :roll:

PD2/20
High Rise Poster!
Posts: 358
Joined: Sun Feb 23, 2014 2:32 pm

[U/C] Re: Port Adelaide Dock Spur Line

#155 Post by PD2/20 » Fri Jun 21, 2019 1:18 pm

how good is he wrote:
Fri Jun 21, 2019 10:38 am
The nitty gritty needs to come out and all has to be fully transparent. If a contract was signed how can this Govt terminate it? Who costed the project at $16m and what has now caused it to blow out 250%? Is the company that was awarded the contract now getting paid out [obviously a reduced amount] for doing nothing?
The contract was awarded to PTPA (https://ptpa.com.au/) who have been awarded the contract for the North Western Planning Study. They are also carrying out the North East Public Transport Study and are constructing Oaklands Crossing, City South Tram Line Replacement and Paradise Park 'n' Ride all on a design and build basis. Surely planning studies should be independent of the design/build process.

Westside
High Rise Poster!
Posts: 251
Joined: Tue May 12, 2009 4:30 pm

[U/C] Re: Port Adelaide Dock Spur Line

#156 Post by Westside » Fri Jun 21, 2019 2:20 pm

So disappointing. Even at $40M, it's still small potatoes (although it should be a pretty fancy development for that price). The benefits of this project are surely greater than any of the intersection upgrades that benefit a handful of single-occupant vehicles. And it plays into their own mantra of transferring passengers to rail nodes, which slightly makes up for the reduced bus services along Port Rd. This is a double blow against public transport and reinforces Liberal's disdain for it!

Honey of a City
High Rise Poster!
Posts: 262
Joined: Tue Oct 15, 2013 6:42 pm

[U/C] Re: Port Adelaide Dock Spur Line

#157 Post by Honey of a City » Fri Jun 21, 2019 4:06 pm

How cost effective is storing concrete sleepers he claims are for Brighton right at the Port Spur site, which is not an active railyard? Does Knoll think we’re all idiots? There is a smelly lack of transparency happening which FOI will no doubt reveal. Will the $40 million detailed costing (nice round figure by the way) be released? The recent budget allocated just $8 million for the new Tonsley station. If the Port Dock station was equivalent that would leave $32 million to refurb the existing rail line from Alberton. Gold plated rails for sure.

User avatar
omada
Donating Member
Donating Member
Posts: 686
Joined: Mon Jul 16, 2007 10:03 am
Location: Eden Hills

[U/C] Re: Port Adelaide Dock Spur Line

#158 Post by omada » Fri Jun 21, 2019 4:29 pm

Yep, agreed with all said - this STINKS.

So the Libs claim grade separation is investment in P.T - umm, strictly not true , it's to ease congestion for motorists predominately.

:wallbash:

User avatar
Spotto
Legendary Member!
Posts: 681
Joined: Wed May 15, 2019 9:05 pm

[U/C] Re: Port Adelaide Dock Spur Line

#159 Post by Spotto » Fri Jun 21, 2019 5:06 pm

omada wrote:
Fri Jun 21, 2019 4:29 pm
So the Libs claim grade separation is investment in P.T - umm, strictly not true , it's to ease congestion for motorists predominately.
Grade separations serve to benefit both trains and motorists/pedestrians.

But regardless, something is VERY fishy about sudden the cancellation of the Port Dock project...

User avatar
Nathan
Super Size Scraper Poster!
Posts: 3761
Joined: Tue Feb 03, 2009 1:09 pm
Location: Bowden
Contact:

[U/C] Re: Port Adelaide Dock Spur Line

#160 Post by Nathan » Fri Jun 21, 2019 5:08 pm

Grade separations only benefit trains if it allows for higher frequency running. If you're not doing that, then yes, it's a road project.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2567
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: [PRO] Re: Port Adelaide Dock Spur Line

#161 Post by ChillyPhilly » Fri Jun 21, 2019 5:15 pm

Honey of a City wrote:How cost effective is storing concrete sleepers he claims are for Brighton right at the Port Spur site, which is not an active railyard? Does Knoll think we’re all idiots? There is a smelly lack of transparency happening which FOI will no doubt reveal. Will the $40 million detailed costing (nice round figure by the way) be released? The recent budget allocated just $8 million for the new Tonsley station. If the Port Dock station was equivalent that would leave $32 million to refurb the existing rail line from Alberton. Gold plated rails for sure.
C O R R U P T I O N
Our state, our city, our future.

All views expressed on this forum are my own.

Waewick
Super Size Scraper Poster!
Posts: 3620
Joined: Tue Jun 10, 2008 1:39 pm

[U/C] Re: [PRO] Re: [PRO] Re: Port Adelaide Dock Spur Line

#162 Post by Waewick » Fri Jun 21, 2019 8:27 pm

ChillyPhilly wrote:
Honey of a City wrote:How cost effective is storing concrete sleepers he claims are for Brighton right at the Port Spur site, which is not an active railyard? Does Knoll think we’re all idiots? There is a smelly lack of transparency happening which FOI will no doubt reveal. Will the $40 million detailed costing (nice round figure by the way) be released? The recent budget allocated just $8 million for the new Tonsley station. If the Port Dock station was equivalent that would leave $32 million to refurb the existing rail line from Alberton. Gold plated rails for sure.
C O R R U P T I O N
Refer it to ICAC.

rev
SA MVP (Most Valued Poster 4000+)
Posts: 5996
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: Port Adelaide Dock Spur Line

#163 Post by rev » Sat Jun 22, 2019 1:26 pm

Nathan wrote:
Fri Jun 21, 2019 12:08 pm
LOL, and now Knoll is claiming they're not for the Port Dock project, but for Rail Revitalisation and projects like the Brighton Rd and Torrens Rd level crossings. That's why they're all lined up next to the Port Dock project. :roll:
So they've ordered materials for two projects that are still in the planning stages at best? :lol:

rev
SA MVP (Most Valued Poster 4000+)
Posts: 5996
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: [PRO] Re: Port Adelaide Dock Spur Line

#164 Post by rev » Sat Jun 22, 2019 1:31 pm

ChillyPhilly wrote:
Fri Jun 21, 2019 5:15 pm
Honey of a City wrote:How cost effective is storing concrete sleepers he claims are for Brighton right at the Port Spur site, which is not an active railyard? Does Knoll think we’re all idiots? There is a smelly lack of transparency happening which FOI will no doubt reveal. Will the $40 million detailed costing (nice round figure by the way) be released? The recent budget allocated just $8 million for the new Tonsley station. If the Port Dock station was equivalent that would leave $32 million to refurb the existing rail line from Alberton. Gold plated rails for sure.
C O R R U P T I O N
Corruption?
Or just plain old politics...previous government starts small project in it's party heartland that will benefit locals and the expanded community (once the housing projects are done)....new government from the other side of politics cancels it....

The only issue is that they aren't telling you the truth. That's nothing new for politicians of either persuasion, but hardly corruption for ICAC to look into.

User avatar
SRW
Donating Member
Donating Member
Posts: 3543
Joined: Fri Jun 08, 2007 9:42 pm
Location: Glenelg

[U/C] Re: Port Adelaide Dock Spur Line

#165 Post by SRW » Sat Jun 22, 2019 1:49 pm

Yeah, let's be sensible throwing such accusations around, so that when real corruption comes up we know what the word means.

What we have here is classic partisan misdirection and misinformation. Anything but the straightup truth.
Keep Adelaide Weird

Post Reply