Crane Counter: CBD 8 | Metro 8 | Total 16
- timtam20292
- Legendary Member!
- Posts: 1394
- Joined: Tue Apr 19, 2016 1:03 pm
Re: Crane Counter: CBD 14 | Metro 2 | Total 16
Complete crane 8/3/2018
- Attachments
-
- 20180308_realm.jpg (102.01 KiB) Viewed 7532 times
Re: Crane Counter: CBD 14 | Metro 2 | Total 16
Kodo crane seen from Vitoria Square near GPO. 11/3/2018
- Attachments
-
- 20180311_kodo crane.jpg (486.41 KiB) Viewed 7371 times
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2588
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
Re: Crane Counter: CBD 14 | Metro 2 | Total 16
There are at least four cranes visible all the way from the northern end of the N-S Motorway. Looks great.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
-
- High Rise Poster!
- Posts: 289
- Joined: Thu Jul 06, 2017 11:35 am
Re: Crane Counter: CBD 14 | Metro 1 | Total 15
Crane base is in at Adelaidean. Will be a stretch to the northwestern corner. I predict a mobile crane will be in use during the podium build.
- Attachments
-
- IMG_1565.JPG (690.15 KiB) Viewed 6789 times
Re: Crane Counter: CBD 14 | Metro 1 | Total 15
Henley Beach Road section of West Terrace today. So many cranes in view.
Sent from my iPhone using Tapatalk
Re: Crane Counter: CBD 14 | Metro 1 | Total 15
Multiple cranes visible from Rundle Mall!
Sent from my SM-A300Y using Tapatalk
Sent from my SM-A300Y using Tapatalk
Re: Crane Counter: CBD 14 | Metro 1 | Total 15
The crane for One On The Park, at 179 Greenhill Rd, is going up today Monday 16/4/2018. There are still 2 more sections to be added to the main lifting beam.
- Attachments
-
- 20180416_parkside 2.jpg (145.79 KiB) Viewed 5972 times
-
- 20180416_parkside 1.jpg (245.44 KiB) Viewed 5972 times
Re: Crane Counter: CBD 14 | Metro 2 | Total 16
The completed crane (later today 6pm). (Sorry about the picture quality -bit too late in day).
- Attachments
-
- 20180416_PARKSIDE 3.jpg (225.86 KiB) Viewed 5898 times
Re: Crane Counter: CBD 14 | Metro 2 | Total 16
The second crane at the Calvary site (the one nearest Pulteney St) gained height today 5/5/2108.
- Attachments
-
- 20180505_calv 2.jpg (172.27 KiB) Viewed 5360 times
Re: Crane Counter: CBD 14 | Metro 2 | Total 16
Crane tower as at 6/5/2108. It should be completed some time this week.
- Attachments
-
- 20180506_frome.jpg (166.25 KiB) Viewed 5247 times
Re: Crane Counter: CBD 14 | Metro 2 | Total 16
May update
Adelaidean partially up. Dwell and Adelaide high likely to come down in the next couple of months.
East Park should go up in that time. I would think there would also be a tower crane at Eight Glenelg with foundations well under way.
Sofitel starting in 2 weeks and construction on Market street hotel is imminent with site clearing finalised. 269 North Terrace, Casino hotel and Festival office tower commencing shortly too.
Location...........................Levels..................Crane
Completed 2018
Under Construction/SWP CBD
Adelaidean...................................................36 (135m) ............................1
Renaissance Arcade (Realm)..............................40 (132m)............................1
29 Angus Street (Kodo).....................................30 (103m)............................1
114 Waymouth Street (U2).................................26 (ONH)
260 Flinders Street (Stage 1)...............................25....................................1
177-179 Victoria Square.....................................22....................................1
Synagogue Place Student tower............................21....................................1
West Franklin.................................................21/19................................2
10 Pitt Street (Ucity)........................................19....................................1
89 Gray Street................................................17....................................2
295 Pirie Street...............................................16
Calvary Hospital - Angus Street............................13....................................2
250 East Terrace...............................................8....................................1
Botanic High - Frome Street ................................7....................................1
TOTAL CBD CRANES:..................................15
Under Construction/SWP METRO
Park Central - Bowden.....................................12
Eight - Glenelg..............................................12
B Apartments - Bowden....................................7
Adelaide Airport Hotel.....................................7......................................1
Brighton Dunes..............................................7......................................1
TOTAL METRO CRANES:.................................2
TOTAL ADELAIDE CRANES:.............................17
Commencing May 2018
269 North Terrace........................................34 (118m)
Sofitel Currie Street......................................32 (117m)
Festival Centre............................................27 (108m)
23-29 Market Street......................................17
Commencing June/July 2018
157 Waymouth Street....................................23
203 North Terrace........................................19
14 Bentham Street.......................................18
69-71 Light Square.......................................14
SkyCity Hotel..............................................12
53 Hutt Street (Opus)....................................12
Commencing August 2018
SAHMRI 2...................................................12
Approved/Proposed Upcoming
322 King William Street (South).......................31 (114m)
322 King William Street (North)........................31 (114m)
Penny Place...............................................23
13-21 Coglin Street......................................23 (Pro)
399 King William Street.................................23 (Pro)
73 Pirie Street............................................21
42-56 Franklin Street....................................21 (Pro)
260 Flinders Street (Stage 2)...........................20
211-215 South Terrace..................................19
126 Wright Street........................................18
126 Wakefield Street....................................18
20 Toms Court............................................17 (Pro)
Ascend Hotel West Terrace.............................14
135 South Terrace (Parkland Vista)...................13
174-180 Wright Street...................................10
185 Pirie Street...........................................8
Adelaidean partially up. Dwell and Adelaide high likely to come down in the next couple of months.
East Park should go up in that time. I would think there would also be a tower crane at Eight Glenelg with foundations well under way.
Sofitel starting in 2 weeks and construction on Market street hotel is imminent with site clearing finalised. 269 North Terrace, Casino hotel and Festival office tower commencing shortly too.
Location...........................Levels..................Crane
Completed 2018
Under Construction/SWP CBD
Adelaidean...................................................36 (135m) ............................1
Renaissance Arcade (Realm)..............................40 (132m)............................1
29 Angus Street (Kodo).....................................30 (103m)............................1
114 Waymouth Street (U2).................................26 (ONH)
260 Flinders Street (Stage 1)...............................25....................................1
177-179 Victoria Square.....................................22....................................1
Synagogue Place Student tower............................21....................................1
West Franklin.................................................21/19................................2
10 Pitt Street (Ucity)........................................19....................................1
89 Gray Street................................................17....................................2
295 Pirie Street...............................................16
Calvary Hospital - Angus Street............................13....................................2
250 East Terrace...............................................8....................................1
Botanic High - Frome Street ................................7....................................1
TOTAL CBD CRANES:..................................15
Under Construction/SWP METRO
Park Central - Bowden.....................................12
Eight - Glenelg..............................................12
B Apartments - Bowden....................................7
Adelaide Airport Hotel.....................................7......................................1
Brighton Dunes..............................................7......................................1
TOTAL METRO CRANES:.................................2
TOTAL ADELAIDE CRANES:.............................17
Commencing May 2018
269 North Terrace........................................34 (118m)
Sofitel Currie Street......................................32 (117m)
Festival Centre............................................27 (108m)
23-29 Market Street......................................17
Commencing June/July 2018
157 Waymouth Street....................................23
203 North Terrace........................................19
14 Bentham Street.......................................18
69-71 Light Square.......................................14
SkyCity Hotel..............................................12
53 Hutt Street (Opus)....................................12
Commencing August 2018
SAHMRI 2...................................................12
Approved/Proposed Upcoming
322 King William Street (South).......................31 (114m)
322 King William Street (North)........................31 (114m)
Penny Place...............................................23
13-21 Coglin Street......................................23 (Pro)
399 King William Street.................................23 (Pro)
73 Pirie Street............................................21
42-56 Franklin Street....................................21 (Pro)
260 Flinders Street (Stage 2)...........................20
211-215 South Terrace..................................19
126 Wright Street........................................18
126 Wakefield Street....................................18
20 Toms Court............................................17 (Pro)
Ascend Hotel West Terrace.............................14
135 South Terrace (Parkland Vista)...................13
174-180 Wright Street...................................10
185 Pirie Street...........................................8
Re: Crane Counter: CBD 15 | Metro 2 | Total 17
So basically if all goes to plan, we will have 6 buildings above 100m tall under construction, I don’t think has ever happened in the history of Adelaide, especially since we only currently have 3 buildings over 100m. This is brilliant news for Adelaide and I could say I’m mildly excited
Re: Crane Counter: CBD 15 | Metro 2 | Total 17
I'm Big Kev excited!
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
Re: Crane Counter: CBD 15 | Metro 2 | Total 17
The crane at Adelaide airport came down on 26 march 2018 and the crane at One on the Park at 179 Greenhill Rd Parkside (10 story apartments ) went up on 16 April 2018.