I've often thought that as well. The people I feel sorry for are the ones who used to live 50 meters away from South Road but now live right on the very side of it having received not a cent in compensation...
[U/C] M2 North-South Motorway
- Llessur2002
- Super Size Scraper Poster!
- Posts: 2073
- Joined: Mon Mar 17, 2014 4:59 pm
- Location: Inner West
[U/C] Re: North-South Motorway
Last edited by Llessur2002 on Fri Sep 13, 2019 10:31 am, edited 1 time in total.
-
- High Rise Poster!
- Posts: 134
- Joined: Wed May 29, 2013 3:21 pm
[U/C] Re: North-South Motorway
Yep... you'd be praying that your house would be one of the ones aquired not one of the ones left!
-
- Sen-Rookie-Sational
- Posts: 38
- Joined: Tue Mar 05, 2019 6:02 pm
[U/C] Re: North-South Motorway
Are we going to speculate about what will be demolished in this thread?
They already announced where the tunnel goes after the tram line (if they build it of course), but what about the tunnel from Hindmarsh to South Road/ANZAC Highway Ashford?
Nearly all of these properties on the eastern side of South Road, from Barwell Avenue to ANZAC Highway, are houses. Are these a prime candidate for the proposed claim zone and bonuses?
They already announced where the tunnel goes after the tram line (if they build it of course), but what about the tunnel from Hindmarsh to South Road/ANZAC Highway Ashford?
Nearly all of these properties on the eastern side of South Road, from Barwell Avenue to ANZAC Highway, are houses. Are these a prime candidate for the proposed claim zone and bonuses?
[U/C] Re: North-South Motorway
Darlington Upgrade Project Newsletter September 2019
https://dpti.sa.gov.au/__data/assets/pd ... letter.pdf
https://dpti.sa.gov.au/__data/assets/pd ... letter.pdf
[U/C] Re: North-South Motorway
Ran past the Torrens Road intersection and saw the new screens that have been put up.
What a horror show!
What a horror show!
Sticking feathers up your butt does not make you a chicken
[U/C] Re: North-South Motorway
The image at the top of page 2 reminds me of those photos of 16 lane highways in China suddenly being funneled through a toll gate that only has 2 lanes open todayFuryan wrote: ↑Sat Sep 14, 2019 4:25 pmDarlington Upgrade Project Newsletter September 2019
https://dpti.sa.gov.au/__data/assets/pd ... letter.pdf
[U/C] Re: North-South Motorway
In this scenario you also presumably bought the property in that location in the first place though so don't mind it.
[U/C] Re: North-South Motorway
Happy to hear the Ayliffes Road bridge will (hopefully) be opening this year!Furyan wrote: ↑Sat Sep 14, 2019 4:25 pmDarlington Upgrade Project Newsletter September 2019
https://dpti.sa.gov.au/__data/assets/pd ... letter.pdf
On an unrelated note, will the remedial works (landscaping, footpaths, kerbing, etc) on the southbound lanes of MSR continue past McDonalds up to BP? Works on the northbound lanes finishes just before Hungry Jack's where the new pathway cuts behind HJ's. It would look a bit odd if one side of the footpath is shiny and new, and the other is old and crumbling.
[U/C] Re: North-South Motorway
Look odd? That's the way they roll with landscaping of public works in SA. And don't worry about the miss match, within 12 months it will all be a weed infested dead mess, so it will all be matching anyway,Spotto wrote: ↑Wed Sep 18, 2019 11:24 amHappy to hear the Ayliffes Road bridge will (hopefully) be opening this year!Furyan wrote: ↑Sat Sep 14, 2019 4:25 pmDarlington Upgrade Project Newsletter September 2019
https://dpti.sa.gov.au/__data/assets/pd ... letter.pdf
On an unrelated note, will the remedial works (landscaping, footpaths, kerbing, etc) on the southbound lanes of MSR continue past McDonalds up to BP? Works on the northbound lanes finishes just before Hungry Jack's where the new pathway cuts behind HJ's. It would look a bit odd if one side of the footpath is shiny and new, and the other is old and crumbling.
[U/C] Re: North-South Motorway
R2P Timeline, website isn't live yet, hence the scan (click for higher res)
[U/C] Re: North-South Motorway
3 years to finish what is realistically in the grand scheme of things probably the simplest and most straightforward section of the whole NS Corridor project...
Something doesn't seem right here.
Something doesn't seem right here.
Any views and opinions expressed are of my own, and do not reflect the views or opinions of any organisation of which I have an affiliation with.
[U/C] Re: North-South Motorway
Dragging it out so there is no gap by the time the next section(s) start? Let’s be honest it isn’t going to be anytime soon, going by previous projects on NSMW.
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk
-
- Gold-Member ;)
- Posts: 74
- Joined: Mon Apr 06, 2015 6:53 pm
[U/C] Re: North-South Motorway
2020 is only 3 months away. If its completed early 2022, thats only 2 1/4 years from now
- ChillyPhilly
- Super Size Scraper Poster!
- Posts: 2588
- Joined: Sun Dec 07, 2008 11:35 pm
- Location: Kaurna Land.
- Contact:
[U/C] Re: North-South Motorway
Pretty believable timelines until the end of 2020. Then it gets weird.
I think it's being dragged out not because of other sections, but because of the State Election in 2022.
I think it's being dragged out not because of other sections, but because of the State Election in 2022.
Our state, our city, our future.
All views expressed on this forum are my own.
All views expressed on this forum are my own.
Who is online
Users browsing this forum: Google Adsense [Bot] and 135 guests