[U/C] M2 North-South Motorway

Threads relating to transport, water, etc. within the CBD and Metropolitan area.
Message
Author
SBD
Super Size Scraper Poster!
Posts: 2529
Joined: Thu Apr 03, 2014 3:49 pm
Location: Blakeview

[U/C] Re: M2 North-South Motorway

#6121 Post by SBD » Tue Mar 05, 2024 6:46 pm

NTRabbit wrote:
Tue Mar 05, 2024 2:03 am
Sydney is the city of the rubber stamp, where construction and gambling firms alike are afforded the opportunity to audit themselves and confirm they've done nothing wrong
I thought I heard the first anyone knew of a problem in sydney was when the tunnel workers noticed stuff falling from the ceiling. I think the SA tunnel should never have exposed earth ceiling as it's digging through sediment and being reinforced as it goes.

abc
Legendary Member!
Posts: 663
Joined: Tue Sep 27, 2022 10:35 pm

[U/C] Re: M2 North-South Motorway

#6122 Post by abc » Tue Mar 05, 2024 10:41 pm

Bangladesh levels of building standards in this country

we couldn't even build an underpass in this state without the sides caving in at Bedford Park

greenknight
Sen-Rookie-Sational
Posts: 31
Joined: Sun Feb 25, 2018 1:45 pm

[U/C] Re: M2 North-South Motorway

#6123 Post by greenknight » Wed Mar 06, 2024 4:51 pm

I know this isnt technically part of the North-South Motorway but it seems like its T2D Branded

Raglan and Edward Street Realignment has been released:
https://www.youtube.com/watch?v=JOzpm1JyKyY

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6043
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: M2 North-South Motorway

#6124 Post by rev » Wed Mar 06, 2024 5:07 pm

Its part of the wider project.
Was just on the news. They also revealed the tunnelling machines will arrive next year.

mattblack
Legendary Member!
Posts: 1003
Joined: Fri Feb 15, 2008 11:20 am

[U/C] Re: M2 North-South Motorway

#6125 Post by mattblack » Wed Mar 06, 2024 5:34 pm

abc wrote:
Tue Mar 05, 2024 10:41 pm
Bangladesh levels of building standards in this country

we couldn't even build an underpass in this state without the sides caving in at Bedford Park
I doubt you've ever been to Bangladesh for comparison.

rev
SA MVP (Most Valued Poster 4000+)
Posts: 6043
Joined: Sat Nov 11, 2006 12:14 pm

[U/C] Re: M2 North-South Motorway

#6126 Post by rev » Wed Mar 06, 2024 6:31 pm

Tender submissions for this close April, awarding of the project is expected third quarter this year.

Nort
Super Size Scraper Poster!
Posts: 2171
Joined: Tue Feb 09, 2010 2:08 pm

[U/C] Re: M2 North-South Motorway

#6127 Post by Nort » Thu Mar 07, 2024 8:39 am

mattblack wrote:
Wed Mar 06, 2024 5:34 pm
abc wrote:
Tue Mar 05, 2024 10:41 pm
Bangladesh levels of building standards in this country

we couldn't even build an underpass in this state without the sides caving in at Bedford Park
I doubt you've ever been to Bangladesh for comparison.
Hey, let's give abc the benefit of the doubt and opportunity to share what Bangladesh infrastructure he was comparing it to.

User avatar
ChillyPhilly
Super Size Scraper Poster!
Posts: 2591
Joined: Sun Dec 07, 2008 11:35 pm
Location: Kaurna Land.
Contact:

[U/C] Re: M2 North-South Motorway

#6128 Post by ChillyPhilly » Thu Mar 07, 2024 9:10 am

greenknight wrote:
Wed Mar 06, 2024 4:51 pm
I know this isnt technically part of the North-South Motorway but it seems like its T2D Branded

Raglan and Edward Street Realignment has been released:
https://www.youtube.com/watch?v=JOzpm1JyKyY
So a dogleg is removed, but a new signalised intersection will replace it at Price Street. So there will still be two intersections within 270 metres, plus Furness Ave a short distance south. This might need to go back to the drawing board.
Our state, our city, our future.

All views expressed on this forum are my own.

User avatar
rhino
Super Size Scraper Poster!
Posts: 3067
Joined: Thu Sep 29, 2005 4:37 pm
Location: Nairne

[U/C] Re: M2 North-South Motorway

#6129 Post by rhino » Thu Mar 07, 2024 10:16 am

ChillyPhilly wrote:
Thu Mar 07, 2024 9:10 am
So a dogleg is removed, but a new signalised intersection will replace it at Price Street. So there will still be two intersections within 270 metres, plus Furness Ave a short distance south. This might need to go back to the drawing board.
Yes, that was my thinking too. Perhaps the Price St lights could be scrapped until the tunnel is built, and by then South Road traffic may even be such that they are no longer needed?
cheers,
Rhino

dbl96
High Rise Poster!
Posts: 233
Joined: Thu Sep 02, 2010 4:31 pm

[U/C] Re: M2 North-South Motorway

#6130 Post by dbl96 » Fri Mar 08, 2024 11:27 am

rhino wrote:
Thu Mar 07, 2024 10:16 am
ChillyPhilly wrote:
Thu Mar 07, 2024 9:10 am
So a dogleg is removed, but a new signalised intersection will replace it at Price Street. So there will still be two intersections within 270 metres, plus Furness Ave a short distance south. This might need to go back to the drawing board.
Yes, that was my thinking too. Perhaps the Price St lights could be scrapped until the tunnel is built, and by then South Road traffic may even be such that they are no longer needed?
I'm not sure why they have left it with a roundabout t-junction requiring you to turn right into Raglan Avenue. It would be much better for traffic movement across the network to route Edward St seamlessly into Raglan Avenue.

Raider
Sen-Rookie-Sational
Posts: 36
Joined: Sun Nov 01, 2009 2:05 pm

[U/C] Re: M2 North-South Motorway

#6131 Post by Raider » Fri Mar 08, 2024 2:40 pm

I believe they're removing the dedicated pedestrian crossing just south of Price Street to integrate it into this new set. So overall, still a reduction of 1 set of lights.

abc
Legendary Member!
Posts: 663
Joined: Tue Sep 27, 2022 10:35 pm

[U/C] Re: M2 North-South Motorway

#6132 Post by abc » Fri Mar 08, 2024 5:29 pm

mattblack wrote:
Wed Mar 06, 2024 5:34 pm
abc wrote:
Tue Mar 05, 2024 10:41 pm
Bangladesh levels of building standards in this country

we couldn't even build an underpass in this state without the sides caving in at Bedford Park
I doubt you've ever been to Bangladesh for comparison.
hyperbole goes way over your head doesn't it...

marbles
Gold-Member ;)
Posts: 62
Joined: Sun Feb 23, 2020 4:22 pm

[U/C] Re: M2 North-South Motorway

#6133 Post by marbles » Sat Mar 09, 2024 9:59 am

well therell be no more waiting at light at raglan which is faster

i think people trying to cross road from hungrys jacks to north side of raglan will find that corner very dangerous

i guess the design is a 20 years plan for when the tunnels will be underneath and 50 60 % of the traffic wont be there

youd think ultimately castle plaza would love that block of land in the dog leg and extend the whole castle plaza north

personally i dont think the left turn to raglan should be there at all, castle plaza patrons can all go to the round about and wait back up to the lights

does hungry jacks still wanna be there when the tunnels come in? maybe a BP/Hungrys to go on the N/W corner of new raglan/edwards intersection to come

the traffic lights at southern end right turn should go too if theyre gonna put an extra right tun in to castle plaza

abc
Legendary Member!
Posts: 663
Joined: Tue Sep 27, 2022 10:35 pm

[U/C] Re: M2 North-South Motorway

#6134 Post by abc » Sat Mar 09, 2024 10:57 am

has Darlington to Torrens even been approved/funded yet or are we still waiting for that?

I've heard estimates of 10 year construction timeline and this keeps getting shifted out because there's no start in major works, meanwhile the current South Rd situation is choking the west side of town and getting worse.

Eurostar
Legendary Member!
Posts: 930
Joined: Thu Jun 24, 2010 3:44 pm

[U/C] Re: M2 North-South Motorway

#6135 Post by Eurostar » Sat Mar 09, 2024 11:06 am

Sites like Edwardstown are ideal for high density TOD , like Bondi Junction. Sink the train line, build TOD surrounding a new Woodlands Station

Post Reply

Who is online

Users browsing this forum: Alyx and 7 guests