- Fri Nov 08, 2024 1:28 pm
- Forum: CBD Development
- Topic: [APP] Masonic Lodge | 183m | 37 Levels | Mixed Use
- Replies: 699
- Views: 221686
[APP] Re: Masonic Lodge | 183m | 37 Levels | Mixed Use
The well-spoken @Micbara was on the ABC Radio broadcast today. He said that the previous plans to incorporate a SA history museum component into the building did not receive funding/support from the state government, so instead they have opted to increase the hotel portion of the building. From mem...
- Sun Oct 27, 2024 12:17 pm
- Forum: CBD Development
- Topic: [U/C] 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
- Replies: 114
- Views: 58192
[U/C] Re: 98-100 North Terrace | 79m | 23 Levels | Little National Hotel
I don't think that's the crane pad. Looks like a pad footing with starter bars for columns. Crane pad would be near the front of the site.
- Thu Aug 22, 2024 12:08 pm
- Forum: Infrastructure/Transport Development
- Topic: [U/C] M2 North-South Motorway
- Replies: 6333
- Views: 1645521
[U/C] Re: [U/C] Re: M2 North-South Motorway
I'd like to think this is a bottleneck rather than severe induced demand. I haven't heard what the current design offers to avoid the same thing northbound at Anzac Highway since the flyover was replaced in the design by traffic lights. I assume they're forecasting a lot of the city bound traffic t...
- Sun Aug 18, 2024 5:51 pm
- Forum: CBD Development
- Topic: [U/C] Victoria Tower - 36 Grote Street | 127m | 37 levels | apartments
- Replies: 358
- Views: 138665
[U/C] Re: Victoria Tower - 36 Grote Street | 123m | 35 levels | apartments
Post on linked in by Auta say they expect to top out in December this year! That is exciting! But in my opinion is unrealistic, or just a lie, however you wanna take it. They are building level 18 at the moment, and they started construction at the beginning of July 2023, so more than a year to get...
- Fri Aug 16, 2024 8:46 am
- Forum: CBD Development
- Topic: [COM] 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
- Replies: 471
- Views: 190395
[COM] Re: 145-159 King William Street (GPO) | 61m | 16 Levels | Hotel
There's no missing struts. The loads from the upper floors are transferred to the columns via the larger beams just above the driveways to prevent vehicle access being obstructed.
- Fri Aug 16, 2024 8:35 am
- Forum: CBD Development
- Topic: [U/C] Central Market Arcade Redevelopment | 130m | 39 levels
- Replies: 773
- Views: 265324
[U/C] Re: Central Market Arcade Redevelopment | 130m | 39 levels
From Woods Bagot's LinkedIn page:
- Thu Jul 25, 2024 2:50 pm
- Forum: CBD Development
- Topic: [APP] Masonic Lodge | 183m | 37 Levels | Mixed Use
- Replies: 699
- Views: 221686
[APP] Re: Masonic Lodge | 183m | 37 Levels | Mixed Use
It's got planning approval, but still needs to go through building rules consent before construction commences. The design specifics needs to be refined from the planning lodgment to the detailed design stage (also to get it to a stage where it can be sent out for tender to the Contractors).
- Thu Jul 25, 2024 1:06 pm
- Forum: CBD Development
- Topic: News & Discussion: General CBD Development
- Replies: 3109
- Views: 898420
Re: News & Discussion: General CBD Development
He says a lot of stupid things in this, which isn’t surprising: https://www.indaily.com.au/news/adelaide/2024/07/25/minister-slams-door-on-office-block-housing-fix Actually, he isn't wrong in most of his comments here. Most of the old office buildings are not suited to conversion to residential, an...
- Wed Jul 03, 2024 11:46 am
- Forum: Infrastructure/Transport Development
- Topic: News & Discussion: Adelaide Metro Trains
- Replies: 6263
- Views: 1613176
Re: News & Discussion: Adelaide Metro Trains
Do the tracks still go through Kromer Crossing, or did they get covered with bitumen after the line stopped being used? Kromer Crossing has been ripped up and replaced with a roundabout. The line is still in place either side of the crossing though - trains could be reinstated as far as Tanunda wit...
- Wed Jul 03, 2024 10:29 am
- Forum: Infrastructure/Transport Development
- Topic: News & Discussion: Adelaide Metro Trains
- Replies: 6263
- Views: 1613176
Re: News & Discussion: Adelaide Metro Trains
How much of the original right of way is still there (i.e. not used for walking tracks etc) if they wanted to re-use it for passenger services? The entire right of way including the tracks between Gawler Central and Lyndoch is still in place. Some of the infrastructure (railway crossing lights, sig...
- Tue Jul 02, 2024 10:28 am
- Forum: Infrastructure/Transport Development
- Topic: News & Discussion: O-Bahn
- Replies: 1847
- Views: 485490
Re: News & Discussion: O-Bahn
That is what they were discussing. I didnt take it as a knock on the obahn, more the discussion around how they were going to do works given its popularity. I am assuming this is a potential project for after South Rd has finished and the state can get transport funding for another significant piec...
- Mon Jun 10, 2024 10:23 am
- Forum: CBD Development
- Topic: [ONH] 75-79 King William Street | ~38m | 10 Levels | Hotel
- Replies: 384
- Views: 158420
[ONH] Re: 75-79 King William Street | 124m | 36 Levels | Wyndham Grand Hotel
It was broken into a couple of weeks ago - a couple of the doors have been kicked in and the top of the building has been tagged. No photos, but it's pretty noticeable. I noticed this too. The King William Street doors have been kicked in, and the only measures taken have been to put bins in front ...
- Tue May 07, 2024 2:47 pm
- Forum: CBD Development
- Topic: [APP] Masonic Lodge | 183m | 37 Levels | Mixed Use
- Replies: 699
- Views: 221686
- Thu Apr 25, 2024 4:01 pm
- Forum: CBD Development
- Topic: [PRO] Festival Plaza Tower 2 | 149m | 38 Levels | Office
- Replies: 125
- Views: 28406
[PRO] Re: Festival Plaza Tower 2 | 149m | 38 Levels | Office
Are the covered rectangular 'boxes' on the plaza level the columns for the next building? Yes, those boxes are probably hiding the starter reinforcing bars or bar couplers for the columns intended for those locations. There might be some additional strengthening works required to the existing basem...
- Thu Apr 25, 2024 3:57 pm
- Forum: CBD Development
- Topic: [U/C] Victoria Tower - 36 Grote Street | 127m | 37 levels | apartments
- Replies: 358
- Views: 138665
[U/C] Re: Victoria Tower - 36 Grote Street | 123m | 35 levels | apartments
Higher ceiling is probably for the plant room above the office/car park levels. Should be all the resi levels from this point onwards.