[COM] 316-320 South Terrace | 51m | 14lvls | August Towers

All high-rise, low-rise and street developments in the Adelaide and North Adelaide areas.
Message
Author
EBG
Super Size Scraper Poster!
Posts: 2947
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#121 Post by EBG » Mon Jun 13, 2016 10:16 pm

More piling being done in the basement. This part of the site looks very wet compared to the rest of the site.
Attachments
20160612_hutt st 1.jpg
20160612_hutt st 1.jpg (440.85 KiB) Viewed 6550 times

EBG
Super Size Scraper Poster!
Posts: 2947
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#122 Post by EBG » Sat Jun 25, 2016 11:53 pm

The actual basement floor was poured today. There is a service core right up against the lane way on the northern side (in front of the worker with the helicopter float) .Unfortunately I could not fit it into the picture.
Attachments
20160625_hutt st.jpg
20160625_hutt st.jpg (297.21 KiB) Viewed 6294 times

Ben
VIP Member
VIP Member
Posts: 7478
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#123 Post by Ben » Thu Jun 30, 2016 10:54 am

I believe they have applied to add another level.

User avatar
Plasmatron
High Rise Poster!
Posts: 389
Joined: Sun Sep 09, 2007 5:16 pm
Location: St Georges, Adelaide, SA
Contact:

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#124 Post by Plasmatron » Thu Jun 30, 2016 11:54 am

Only one extra level? Oh well, beggars can't be choosers. :P
https://www.youtube.com/UltraVibeProductions

User avatar
monotonehell
VIP Member
VIP Member
Posts: 5466
Joined: Fri Feb 01, 2008 12:10 am
Location: Adelaide, East End.
Contact:

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#125 Post by monotonehell » Thu Jun 30, 2016 1:09 pm

Plasmatron wrote:Only one extra level? Oh well, beggars can't be choosers. :P
Who is begging? ;P
Exit on the right in the direction of travel.

Ben
VIP Member
VIP Member
Posts: 7478
Joined: Mon Dec 19, 2005 11:46 am
Location: Adelaide

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#126 Post by Ben » Wed Jul 06, 2016 8:54 pm

Some pre fab concrete walls have been erected up to the first floor. Still no sign of a crane base and no idea where one would even go.

User avatar
Pikey
VIP Member
VIP Member
Posts: 2450
Joined: Wed Jul 13, 2005 7:41 am
Location: Sitting Down

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#127 Post by Pikey » Thu Jul 07, 2016 8:48 am

Ben wrote:Some pre fab concrete walls have been erected up to the first floor. Still no sign of a crane base and no idea where one would even go.
I believe this one will have a core mounted crane.
Walking on over....

| Sensational-Adelaide.com Moderator |

EBG
Super Size Scraper Poster!
Posts: 2947
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#128 Post by EBG » Thu Jul 07, 2016 10:26 pm

I agree with Pikey in that the crane could be mounted in the core. Pre cast columns were erected for the lower (of the 2 level) basement car park. Picture 7/7/16
Attachments
20160707_HUTT ST 1.jpg
20160707_HUTT ST 1.jpg (427.09 KiB) Viewed 5558 times

EBG
Super Size Scraper Poster!
Posts: 2947
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#129 Post by EBG » Sun Jul 24, 2016 9:26 pm

This project will have 2 basement levels. Picture from Saturday 23 July shows work on the floor level between the 2 basement levels
with a service core at the bottom of the picture. Still no sign of a crane base.
Attachments
20160723_hutt st 1.jpg
20160723_hutt st 1.jpg (489.74 KiB) Viewed 5388 times

EBG
Super Size Scraper Poster!
Posts: 2947
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#130 Post by EBG » Thu Jul 28, 2016 11:39 pm

The lower floor in previous picture was concreted today Thursday 28 July.

EBG
Super Size Scraper Poster!
Posts: 2947
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#131 Post by EBG » Sat Jul 30, 2016 10:34 pm

After the floor between the 2 basements was poured on Thursday the columns for the upper basement were installed Friday. Picture today (30/7/16)
Attachments
20160730_hutt st.jpg
20160730_hutt st.jpg (405.73 KiB) Viewed 5101 times

citywatcher
Legendary Member!
Posts: 866
Joined: Sun Jul 15, 2007 5:51 pm

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#132 Post by citywatcher » Sat Aug 13, 2016 3:11 pm

When is the crane going up

EBG
Super Size Scraper Poster!
Posts: 2947
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#133 Post by EBG » Sat Aug 13, 2016 11:06 pm

Work has now reached the street level. The bondek is now in place for the ground floor and the re-inforcement is ready to be placed and and the concrete should poured this week .If the crane is to be located in the service core it should go up in the next couple of weeks (?)
Attachments
20160813_hutt st 1.jpg
20160813_hutt st 1.jpg (198.17 KiB) Viewed 4763 times
20160813_hutt st 2.jpg
20160813_hutt st 2.jpg (187.91 KiB) Viewed 4763 times

EBG
Super Size Scraper Poster!
Posts: 2947
Joined: Fri Jul 12, 2013 10:49 pm

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#134 Post by EBG » Sat Aug 20, 2016 10:27 pm

The ground floor level was poured today (Saturday 20 /8/16). The South Tce side is less developed. with just steel work only. The service core is located in the bottom right hand corner of picture 1.
Attachments
20160820_hutt st 1.jpg
20160820_hutt st 1.jpg (271.47 KiB) Viewed 4536 times
20160820_hutt st 2.jpg
20160820_hutt st 2.jpg (443.94 KiB) Viewed 4536 times
20160820_hutt st 3.jpg
20160820_hutt st 3.jpg (469.46 KiB) Viewed 4536 times

User avatar
Wayno
VIP Member
VIP Member
Posts: 5138
Joined: Mon Dec 17, 2007 2:18 pm
Location: Torrens Park

[COM] Re: 316-320 South Terrace | 49m | 14lvls | August Towers

#135 Post by Wayno » Tue Aug 23, 2016 7:03 pm

Spoke with a worker this morning. Apparently no permanent crane will be used. He's unsure of the crane type to be used, but he said they are mobile and will recurringly arrive onsite when required.
Opportunity is missed by most people because it is dressed in overalls and looks like work.

Post Reply

Who is online