[U/C] Brougham Place | 57m | 4 x up to 16lvls | Mixed Use
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
Piles have been bored around the perimeter of the site and these are now being capped with a continuous beam then excavation of a basement can begin . The tops of the piles can be seen in the first picture - The circular bits with the spikey rods with the yellow caps. The square bits of reinforcing in picture 3 are called ligatures which hold the long rods in place with 3 (or 4) long rods at the top and same number on the bottom of the beam. the whole lot then gets concreted over to form one continuous beam.
-
- Legendary Member!
- Posts: 870
- Joined: Sun Jul 15, 2007 5:51 pm
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
Anyone know how many stories Stage 1 is ?
Sent from my SM-J730G using Tapatalk
Sent from my SM-J730G using Tapatalk
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
When this project was first announced in 2015 (see page 2 of this thread ), it was proposed to be 11 stories but judging from the sign outside the property now it appears as 12 stories.
-
- Legendary Member!
- Posts: 870
- Joined: Sun Jul 15, 2007 5:51 pm
[U/C] Re: [SWP] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
CheersEBG wrote:When this project was first announced in 2015 (see page 2 of this thread ), it was proposed to be 11 stories but judging from the sign outside the property now it appears as 12 stories.
Sent from my SM-J730G using Tapatalk
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
Excavation of the basement has started, picture 9/8/2020. Please click on picture for bigger.
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
15/8/2020 work is progressing well on the basement. Please click on picture for bigger.
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
As at 20 Aug piling is progressing in the basement for the actual building itself. The previous piling was for the side walls to hold back the sides of the basement. The concrete pump is the white piece of machinery towards the left of the picture. Please click on picture for bigger. I think there could be a tower crane in a month?
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
Update 5/9/2020 the piling rig has gone and they are currently excavating the last part of the basement towards Ward St next to the saved stone building. Please lick on picture for bigger.
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
12/9/2020 it appears that the basement may be more than 1 level deep, but it is hard to see clearly due to the soil stacked up in front of the gate way.
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
The basement is 2 levels deep. The tower crane is on the right hand side behind the stone building. (see crane thread for crane detains). Please click on picture for bigger.
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
Up date 4/10/2020. start of service, in centre of pictures. Please click on pictures for bigger.
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
10/10/20 some more pictures of the basements The tower crane is outside the basement perimeter off to the right hand side of the pictures Please click on pictures for bigger.
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
Update 24/10/20 work on lower basement level. if you look on the side of the precast panels you can see a grove showing the position of the up ramp. Please click on picture for bigger.
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
7/11/2020 work progressing on lower basement level,
[U/C] Re: Brougham Place | 54m | 4 x up to 16lvls | Mixed Use
22/11/2020 Work is progressing on the upper basement. The Bondek (blue material) is permanent formwork which supports the new concrete floor of the upper basement. The service/lift core is in the centre of the building. Please click on picture for bigger.